IAC logo
IAC Assessment: ME0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Textiles
NAICS n/a
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 185,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 7,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $566,467 6,178,195 kWh $0.09
LPG $74,789 11,068 MMBtu $6.76
Fuel Oil #6 $80,918 34,633 MMBtu $2.34
TOTAL ENERGY COSTS $722,174
RECOMMENDED SAVINGS* $41,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,317
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #6 Electricity Usage LPG Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,142
Cost:
$5,400
$5,142 55,979 - - - - $5,142
55,979
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$770
Cost:
$900
- - - - $770 350 -
-
kWh
-
-
MMBtu
$770
350
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,700
Cost:
$19,600
$20,700 225,674 - - - - $20,700
225,674
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,522
Cost:
$3,800
$19,725 215,123 $(-6,203) (-917) - - $19,725
215,123
kWh
$(-6,203)
(-917)
MMBtu
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,617
Cost:
$880
- - - - $1,617 691 -
-
kWh
-
-
MMBtu
$1,617
691
MMBtu
TOTAL RECOMMENDED Savings:
$41,751
Cost:
$30,580
$45,567 496,776 $(-6,203) (-917) $2,387 1,041 $45,567
496,776
kWh
$(-6,203)
(-917)
MMBtu
$2,387
1,041
MMBtu
TOTAL IMPLEMENTED Savings:
$22,317
Cost:
$20,480
$20,700 225,674 - - $1,617 691 $20,700
225,674
kWh
-
-
MMBtu
$1,617
691
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Fuel Oil #6 Electricity Usage LPG Fuel Oil #6