IAC Assessment: ME0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Tungsten filaments
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 94,000
Annual Production 1,000,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $350,958 4,550,410 kWh $0.08
Fuel Oil #6 $36,698 13,762 MMBtu $2.67
TOTAL ENERGY COSTS $387,656
RECOMMENDED SAVINGS* $26,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,688
Cost:
$4,500
$2,688 - - - $2,688
-
kWh
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,453
Cost:
$6,650
$25,000 268,757 $(-6,547) (-1,309) $25,000
268,757
kWh
$(-6,547)
(-1,309)
MMBtu
03: 2.5196 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS Savings:
$5,276
Cost:
$7,200
$5,276 68,288 - - $5,276
68,288
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,417
Cost:
$18,350
$32,964 337,045 $(-6,547) (-1,309) $32,964
337,045
kWh
$(-6,547)
(-1,309)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2