Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1994 |
Principal Product | meat products |
NAICS | n/a |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $50,000,000-$100,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 27,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $355,556 | 4,074,443 | kWh | $0.09 |
Natural Gas | $91,454 | 19,362 | MMBtu | $4.72 |
Fuel Oil #4 | $35,873 | 9,316 | MMBtu | $3.85 |
TOTAL ENERGY COSTS | $482,883 | |||
RECOMMENDED SAVINGS* | $14,918 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #4 | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $6,000 Cost: $3,400 |
- | - | - | - | - | - | $6,000 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$6,000 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,891 Cost: $20 |
$2,891 | 33,118 | - | - | - | - | - | - |
$2,891 33,118 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,933 Cost: $4,200 |
$2,933 | - | - | - | - | - | - | - |
$2,933 - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,480 Cost: $1,140 |
$1,480 | 16,999 | - | - | - | - | - | - |
$1,480 16,999 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $520 Cost: $1,000 |
- | - | - | - | $520 | 105 | - | - |
- - kWh |
- - MMBtu |
$520 105 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $923 Cost: $500 |
$923 | 10,551 | - | - | - | - | - | - |
$923 10,551 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2123 INSULATE FEEDWATER TANK |
Savings: $171 Cost: $68 |
- | - | $171 | 40 | - | - | - | - |
- - kWh |
$171 40 MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,918 Cost: $10,328 |
$8,227 | 60,668 | $171 | 40 | $520 | 105 | $6,000 | - | $8,227 60,668 kWh |
$171 40 MMBtu |
$520 105 MMBtu |
$6,000 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #4 | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #4 | Water Consumption |