IAC logo
IAC Assessment: ME0138
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0138
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product meat products
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 50,000
Annual Production 27,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $355,556 4,074,443 kWh $0.09
Natural Gas $91,454 19,362 MMBtu $4.72
Fuel Oil #4 $35,873 9,316 MMBtu $3.85
TOTAL ENERGY COSTS $482,883
RECOMMENDED SAVINGS* $14,918 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Water Consumption Electricity Usage Natural Gas Fuel Oil #4 Water Consumption
$ kWh $ MMBtu $ MMBtu $ Tgal
01: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$6,000
Cost:
$3,400
- - - - - - $6,000 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$6,000
-
Tgal
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,891
Cost:
$20
$2,891 33,118 - - - - - - $2,891
33,118
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,933
Cost:
$4,200
$2,933 - - - - - - - $2,933
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,480
Cost:
$1,140
$1,480 16,999 - - - - - - $1,480
16,999
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$520
Cost:
$1,000
- - - - $520 105 - - -
-
kWh
-
-
MMBtu
$520
105
MMBtu
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$923
Cost:
$500
$923 10,551 - - - - - - $923
10,551
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
07: 2.2123 INSULATE FEEDWATER TANK Savings:
$171
Cost:
$68
- - $171 40 - - - - -
-
kWh
$171
40
MMBtu
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$14,918
Cost:
$10,328
$8,227 60,668 $171 40 $520 105 $6,000 - $8,227
60,668
kWh
$171
40
MMBtu
$520
105
MMBtu
$6,000
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ Tgal
Electricity Usage Natural Gas Fuel Oil #4 Water Consumption Electricity Usage Natural Gas Fuel Oil #4 Water Consumption