Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | Electrical Components |
NAICS | n/a |
SIC | 3699 - Electrical Equipment & Supplies, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 185,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $393,904 | 4,395,076 | kWh | $0.09 |
Fuel Oil #2 | $47,641 | 11,006 | MMBtu | $4.33 |
TOTAL ENERGY COSTS | $449,123 | |||
RECOMMENDED SAVINGS* | $68,133 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,252 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,883 Cost: $50,267 |
$20,883 | 231,536 | - | - | - | - | - | - | - | - | - | - | - | - |
$20,883 231,536 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $18,527 Cost: $1,500 |
$18,527 | 205,158 | - | - | - | - | - | - | - | - | - | - | - | - |
$18,527 205,158 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $5,200 Cost: $400 |
- | - | - | - | - | - | $5,200 | 1,296,000 | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$5,200 1,296,000 Tgal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING |
Savings: $11,057 Cost: $30,000 |
- | - | - | - | - | - | - | - | - | - | $11,057 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
$11,057 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,796 Cost: $980 |
$2,796 | 30,774 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,796 30,774 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,537 Cost: $1,175 |
$2,757 | 58,617 | $(-220) | (-51) | - | - | - | - | - | - | - | - | - | - |
$2,757 58,617 kWh |
$(-220) (-51) MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,118 Cost: $800 |
$2,118 | 25,791 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,118 25,791 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,900 Cost: $400 |
- | - | - | - | $1,900 | 438 | - | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$1,900 438 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $2,815 Cost: $440 |
$1,820 | 20,223 | - | - | - | - | $614 | 150,000 | - | - | - | - | $381 | - |
$1,820 20,223 kWh |
- - MMBtu |
- - MMBtu |
$614 150,000 Tgal |
- - lb |
- - $ |
$381 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $300 Cost: $150 |
- | - | - | - | - | - | - | - | $300 | 15,000 | - | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
$300 15,000 lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $68,133 Cost: $86,112 |
$48,901 | 572,099 | $(-220) | (-51) | $1,900 | 438 | $5,814 | 1,446,000 | $300 | 15,000 | $11,057 | - | $381 | - | $48,901 572,099 kWh |
$(-220) (-51) MMBtu |
$1,900 438 MMBtu |
$5,814 1,446,000 Tgal |
$300 15,000 lb |
$11,057 - $ |
$381 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,252 Cost: $2,015 |
$4,577 | 78,840 | $(-220) | (-51) | $1,900 | 438 | $614 | 150,000 | - | - | - | - | $381 | - | $4,577 78,840 kWh |
$(-220) (-51) MMBtu |
$1,900 438 MMBtu |
$614 150,000 Tgal |
- - lb |
- - $ |
$381 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption |