IAC logo
IAC Assessment: ME0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Electrical Components
NAICS n/a
SIC 3699 - Electrical Equipment & Supplies, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 185,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $393,904 4,395,076 kWh $0.09
Fuel Oil #2 $47,641 11,006 MMBtu $4.33
TOTAL ENERGY COSTS $449,123
RECOMMENDED SAVINGS* $68,133 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,252
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption
$ kWh $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,883
Cost:
$50,267
$20,883 231,536 - - - - - - - - - - - - $20,883
231,536
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,527
Cost:
$1,500
$18,527 205,158 - - - - - - - - - - - - $18,527
205,158
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$5,200
Cost:
$400
- - - - - - $5,200 1,296,000 - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$5,200
1,296,000
Tgal
-
-
lb
-
-
$
-
-
Tgal
04: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$11,057
Cost:
$30,000
- - - - - - - - - - $11,057 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
$11,057
-
$
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,796
Cost:
$980
$2,796 30,774 - - - - - - - - - - - - $2,796
30,774
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,537
Cost:
$1,175
$2,757 58,617 $(-220) (-51) - - - - - - - - - - $2,757
58,617
kWh
$(-220)
(-51)
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,118
Cost:
$800
$2,118 25,791 - - - - - - - - - - - - $2,118
25,791
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,900
Cost:
$400
- - - - $1,900 438 - - - - - - - - -
-
kWh
-
-
MMBtu
$1,900
438
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
09: 3.4151 MINIMIZE WATER USAGE Savings:
$2,815
Cost:
$440
$1,820 20,223 - - - - $614 150,000 - - - - $381 - $1,820
20,223
kWh
-
-
MMBtu
-
-
MMBtu
$614
150,000
Tgal
-
-
lb
-
-
$
$381
-
Tgal
10: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$300
Cost:
$150
- - - - - - - - $300 15,000 - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$300
15,000
lb
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$68,133
Cost:
$86,112
$48,901 572,099 $(-220) (-51) $1,900 438 $5,814 1,446,000 $300 15,000 $11,057 - $381 - $48,901
572,099
kWh
$(-220)
(-51)
MMBtu
$1,900
438
MMBtu
$5,814
1,446,000
Tgal
$300
15,000
lb
$11,057
-
$
$381
-
Tgal
TOTAL IMPLEMENTED Savings:
$7,252
Cost:
$2,015
$4,577 78,840 $(-220) (-51) $1,900 438 $614 150,000 - - - - $381 - $4,577
78,840
kWh
$(-220)
(-51)
MMBtu
$1,900
438
MMBtu
$614
150,000
Tgal
-
-
lb
-
-
$
$381
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ Tgal
Electricity Usage Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption