Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | TEXTILES |
NAICS | n/a |
SIC | 2299 - Textile Goods, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 58,300 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 7,200 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $111,561 | 1,133,353 | kWh | $0.10 |
LPG | $7,137 | 858 | MMBtu | $8.32 |
Fuel Oil #2 | $8,581 | 1,729 | MMBtu | $4.96 |
TOTAL ENERGY COSTS | $127,279 | |||
RECOMMENDED SAVINGS* | $31,752 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $31,752 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #2 | Electricity Usage | LPG | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,097 Cost: $20,385 |
$15,097 | 165,299 | - | - | - | - |
$15,097 165,299 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $12,904 Cost: $20,000 |
$12,424 | 126,026 | $480 | 58 | - | - |
$12,424 126,026 kWh |
$480 58 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2153 CLOSE OFF UNNEEDED STEAM LINES |
Savings: $1,120 Cost: $200 |
- | - | - | - | $1,120 | 229 |
- - kWh |
- - MMBtu |
$1,120 229 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $952 Cost: $350 |
- | - | - | - | $952 | 195 |
- - kWh |
- - MMBtu |
$952 195 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $907 Cost: $400 |
- | - | - | - | $907 | 186 |
- - kWh |
- - MMBtu |
$907 186 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $772 Cost: $130 |
$772 | 7,327 | - | - | - | - |
$772 7,327 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,752 Cost: $41,465 |
$28,293 | 298,652 | $480 | 58 | $2,979 | 610 | $28,293 298,652 kWh |
$480 58 MMBtu |
$2,979 610 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $31,752 Cost: $41,465 |
$28,293 | 298,652 | $480 | 58 | $2,979 | 610 | $28,293 298,652 kWh |
$480 58 MMBtu |
$2,979 610 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #2 | Electricity Usage | LPG | Fuel Oil #2 |