Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | PRINTED CALENDARS |
NAICS | n/a |
SIC | 2759 - Commercial Printing, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 60,000,000 Pieces |
Production Hrs. Annual | 5,250 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $235,659 | 2,372,216 | kWh | $0.10 |
Fuel Oil #2 | $12,915 | 3,080 | MMBtu | $4.19 |
TOTAL ENERGY COSTS | $251,234 | |||
RECOMMENDED SAVINGS* | $16,521 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,441 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,120 Cost: $16,036 |
$7,120 | 71,219 | - | - | - | - | - | - | - | - |
$7,120 71,219 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $2,340 Cost: $870 |
$2,340 | 23,447 | - | - | - | - | - | - | - | - |
$2,340 23,447 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,447 Cost: $300 |
$1,447 | 14,654 | - | - | - | - | - | - | - | - |
$1,447 14,654 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,288 Cost: $800 |
$1,288 | 12,896 | - | - | - | - | - | - | - | - |
$1,288 12,896 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,175 Cost: $3,519 |
- | - | $1,175 | 400 | - | - | - | - | - | - |
- - kWh |
$1,175 400 MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,050 Cost: $315 |
- | - | $1,050 | 244 | - | - | - | - | - | - |
- - kWh |
$1,050 244 MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $736 Cost: - |
- | - | - | - | - | - | - | - | $736 | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$736 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $455 Cost: $400 |
- | - | $455 | 105 | - | - | - | - | - | - |
- - kWh |
$455 105 MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $455 Cost: - |
- | - | - | - | - | - | $455 | 105 | - | - |
- - kWh |
- - MMBtu |
- - gal |
$455 105 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT |
Savings: $455 Cost: $260 |
- | - | - | - | $455 | 105 | - | - | - | - |
- - kWh |
- - MMBtu |
$455 105 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $16,521 Cost: $22,500 |
$12,195 | 122,216 | $2,680 | 749 | $455 | 105 | $455 | 105 | $736 | - | $12,195 122,216 kWh |
$2,680 749 MMBtu |
$455 105 gal |
$455 105 lb |
$736 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,441 Cost: $5,889 |
$5,075 | 50,997 | $1,630 | 505 | - | - | - | - | $736 | - | $5,075 50,997 kWh |
$1,630 505 MMBtu |
- - gal |
- - lb |
$736 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |