IAC logo
IAC Assessment: ME0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product PRINTED CALENDARS
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 180,000
Annual Production 60,000,000 Pieces
Production Hrs. Annual 5,250
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $235,659 2,372,216 kWh $0.10
Fuel Oil #2 $12,915 3,080 MMBtu $4.19
TOTAL ENERGY COSTS $251,234
RECOMMENDED SAVINGS* $16,521 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,441
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ gal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,120
Cost:
$16,036
$7,120 71,219 - - - - - - - - $7,120
71,219
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$2,340
Cost:
$870
$2,340 23,447 - - - - - - - - $2,340
23,447
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,447
Cost:
$300
$1,447 14,654 - - - - - - - - $1,447
14,654
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,288
Cost:
$800
$1,288 12,896 - - - - - - - - $1,288
12,896
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,175
Cost:
$3,519
- - $1,175 400 - - - - - - -
-
kWh
$1,175
400
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,050
Cost:
$315
- - $1,050 244 - - - - - - -
-
kWh
$1,050
244
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$736
Cost:
-
- - - - - - - - $736 - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
$736
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$455
Cost:
$400
- - $455 105 - - - - - - -
-
kWh
$455
105
MMBtu
-
-
gal
-
-
lb
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$455
Cost:
-
- - - - - - $455 105 - - -
-
kWh
-
-
MMBtu
-
-
gal
$455
105
lb
-
-
$
10: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$455
Cost:
$260
- - - - $455 105 - - - - -
-
kWh
-
-
MMBtu
$455
105
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$16,521
Cost:
$22,500
$12,195 122,216 $2,680 749 $455 105 $455 105 $736 - $12,195
122,216
kWh
$2,680
749
MMBtu
$455
105
gal
$455
105
lb
$736
-
$
TOTAL IMPLEMENTED Savings:
$7,441
Cost:
$5,889
$5,075 50,997 $1,630 505 - - - - $736 - $5,075
50,997
kWh
$1,630
505
MMBtu
-
-
gal
-
-
lb
$736
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $
Electricity Usage Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Administrative Changes