Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | molded polyurethane products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 79,200 |
Annual Production | 10,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $454,859 | 5,482,415 | kWh | $0.08 |
Natural Gas | $51,721 | 7,086 | MMBtu | $7.30 |
Fuel Oil #2 | $14,586 | 2,800 | MMBtu | $5.21 |
TOTAL ENERGY COSTS | $705,975 | |||
RECOMMENDED SAVINGS* | $270,931 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,436 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $58,511 Cost: $73,282 |
$82,249 | 936,694 | $(-23,738) | (-4,565) | - | - | - | - | - | - |
$82,249 936,694 kWh |
$(-23,738) (-4,565) MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,765 Cost: $18,720 |
$9,765 | 117,526 | - | - | - | - | - | - | - | - |
$9,765 117,526 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,889 Cost: $600 |
$3,889 | 43,669 | - | - | - | - | - | - | - | - |
$3,889 43,669 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,986 Cost: $1,700 |
$2,986 | 35,756 | - | - | - | - | - | - | - | - |
$2,986 35,756 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,408 Cost: $750 |
$2,408 | 39,566 | - | - | - | - | - | - | - | - |
$2,408 39,566 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $781 Cost: - |
- | - | - | - | - | - | - | - | $781 | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$781 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $532 Cost: - |
- | - | - | - | - | - | - | - | $532 | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$532 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $500 Cost: - |
- | - | - | - | - | - | - | - | $500 | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $184,809 Cost: $7,514 |
- | - | - | - | $184,809 | 13,656 | - | - | - | - |
- - kWh |
- - MMBtu |
$184,809 13,656 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,750 Cost: $10,000 |
- | - | - | - | - | - | $3,750 | 100,000 | - | - |
- - kWh |
- - MMBtu |
- - gal |
$3,750 100,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $3,000 Cost: - |
- | - | - | - | - | - | $3,000 | 50,000 | - | - |
- - kWh |
- - MMBtu |
- - gal |
$3,000 50,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $270,931 Cost: $112,566 |
$101,297 | 1,173,211 | $(-23,738) | (-4,565) | $184,809 | 13,656 | $6,750 | 150,000 | $1,813 | - | $101,297 1,173,211 kWh |
$(-23,738) (-4,565) MMBtu |
$184,809 13,656 gal |
$6,750 150,000 lb |
$1,813 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,436 Cost: $29,320 |
$13,654 | 161,195 | - | - | - | - | $6,750 | 150,000 | $1,032 | - | $13,654 161,195 kWh |
- - MMBtu |
- - gal |
$6,750 150,000 lb |
$1,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes |