IAC logo
IAC Assessment: ME0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Firearms, human restraints
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 36,000
Annual Production 290,000 Pieces
Production Hrs. Annual 6,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,237 1,616,940 kWh $0.08
Fuel Oil #2 $4,011 746 MMBtu $5.38
TOTAL ENERGY COSTS $135,584
RECOMMENDED SAVINGS* $24,684 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,119
#|Description Savings
Cost
Status Electricity Usage Water Disposal Administrative Changes Water Consumption Electricity Usage Water Disposal Administrative Changes Water Consumption
$ kWh $ Tgal $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,304
Cost:
$43,147
$15,304 216,589 - - - - - - $15,304
216,589
kWh
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,696
Cost:
$600
$4,696 76,202 - - - - - - $4,696
76,202
kWh
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$789
Cost:
$600
$789 11,430 - - - - - - $789
11,430
kWh
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$645
Cost:
-
- - - - $645 - - - -
-
kWh
-
-
Tgal
$645
-
$
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$474
Cost:
$200
$474 6,741 - - - - - - $474
6,741
kWh
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$509
Cost:
$1,800
$509 7,034 - - - - - - $509
7,034
kWh
-
-
Tgal
-
-
$
-
-
Tgal
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,239
Cost:
$2,650
- - $851 321,960 - - $388 - -
-
kWh
$851
321,960
Tgal
-
-
$
$388
-
Tgal
08: 3.4151 MINIMIZE WATER USAGE Savings:
$1,028
Cost:
$570
- - $560 179,580 - - $468 - -
-
kWh
$560
179,580
Tgal
-
-
$
$468
-
Tgal
TOTAL RECOMMENDED Savings:
$24,684
Cost:
$49,567
$21,772 317,996 $1,411 501,540 $645 - $856 - $21,772
317,996
kWh
$1,411
501,540
Tgal
$645
-
$
$856
-
Tgal
TOTAL IMPLEMENTED Savings:
$21,119
Cost:
$43,947
$20,474 299,532 - - $645 - - - $20,474
299,532
kWh
-
-
Tgal
$645
-
$
-
-
Tgal
Savings
Cost
$ kWh $ Tgal $ $ $ Tgal
Electricity Usage Water Disposal Administrative Changes Water Consumption Electricity Usage Water Disposal Administrative Changes Water Consumption