IAC logo
IAC Assessment: ME0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product metal fabrications
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 55,000
Annual Production 50 Pieces
Production Hrs. Annual 4,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,418 564,185 kWh $0.11
Natural Gas $11,086 1,734 MMBtu $6.39
LPG $904 45 MMBtu $20.09
TOTAL ENERGY COSTS $72,408
RECOMMENDED SAVINGS* $6,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,565
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,675
Cost:
$600
$2,675 38,101 - - $2,675
38,101
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,434
Cost:
$5,405
$2,434 33,411 - - $2,434
33,411
kWh
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$890
Cost:
-
- - $890 - -
-
kWh
$890
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$257
Cost:
$600
$257 3,517 - - $257
3,517
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$6,256
Cost:
$6,605
$5,366 75,029 $890 - $5,366
75,029
kWh
$890
-
$
TOTAL IMPLEMENTED Savings:
$3,565
Cost:
$600
$2,675 38,101 $890 - $2,675
38,101
kWh
$890
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes