Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | insulation board |
NAICS | n/a |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 87,000 |
Annual Production | 69,732,000 Thousand Feet |
Production Hrs. Annual | 5,760 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $187,855 | 1,936,694 | kWh | $0.10 |
LPG | $19,895 | 2,800 | MMBtu | $7.11 |
Fuel Oil #2 | $7,883 | 1,685 | MMBtu | $4.68 |
TOTAL ENERGY COSTS | $215,633 | |||
RECOMMENDED SAVINGS* | $59,611 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $42,641 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #2 | Water Disposal | Water Consumption | Electricity Usage | LPG | Fuel Oil #2 | Water Disposal | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $23,325 Cost: $55,000 |
$18,128 | 201,348 | $5,197 | 728 | - | - | - | - | - | - |
$18,128 201,348 kWh |
$5,197 728 MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $15,977 Cost: $6,730 |
$14,250 | 146,835 | - | - | $1,727 | 364 | - | - | - | - |
$14,250 146,835 kWh |
- - MMBtu |
$1,727 364 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,002 Cost: $8,064 |
$11,002 | 146,249 | - | - | - | - | - | - | - | - |
$11,002 146,249 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $4,232 Cost: $8,000 |
$4,695 | 102,579 | $(-463) | (-87) | - | - | - | - | - | - |
$4,695 102,579 kWh |
$(-463) (-87) MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $2,200 Cost: - |
- | - | $2,200 | 415 | - | - | - | - | - | - |
- - kWh |
$2,200 415 MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,736 Cost: $5,000 |
$1,903 | 46,893 | $(-167) | (-32) | - | - | - | - | - | - |
$1,903 46,893 kWh |
$(-167) (-32) MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $290 Cost: $200 |
$290 | 4,103 | - | - | - | - | - | - | - | - |
$290 4,103 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4151 MINIMIZE WATER USAGE |
Savings: $849 Cost: $110 |
- | - | - | - | - | - | $325 | 129,280 | $524 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$325 129,280 Tgal |
$524 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,611 Cost: $83,104 |
$50,268 | 648,007 | $6,767 | 1,024 | $1,727 | 364 | $325 | 129,280 | $524 | - | $50,268 648,007 kWh |
$6,767 1,024 MMBtu |
$1,727 364 MMBtu |
$325 129,280 Tgal |
$524 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $42,641 Cost: $62,040 |
$32,668 | 352,286 | $7,397 | 1,143 | $1,727 | 364 | $325 | 129,280 | $524 | - | $32,668 352,286 kWh |
$7,397 1,143 MMBtu |
$1,727 364 MMBtu |
$325 129,280 Tgal |
$524 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #2 | Water Disposal | Water Consumption | Electricity Usage | LPG | Fuel Oil #2 | Water Disposal | Water Consumption |