IAC logo
IAC Assessment: ME0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Modular Homes
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 60,700
Annual Production 572 Pieces
Production Hrs. Annual 2,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,115 419,988 kWh $0.11
LPG $19,318 2,604 MMBtu $7.42
Fuel Oil #2 $3,120 534 MMBtu $5.84
TOTAL ENERGY COSTS $124,661
RECOMMENDED SAVINGS* $29,958 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,433
#|Description Savings
Cost
Status Electricity Usage LPG Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Electricity Usage LPG Other Liquid (non-haz) Other Liquid (haz) Administrative Changes
$ kWh $ MMBtu $ gal $ gal $ $
01: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$5,460
Cost:
$13,000
- - - - - - - - $5,460 - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
gal
$5,460
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,774
Cost:
$18,027
$4,774 41,618 - - - - - - - - $4,774
41,618
kWh
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,260
Cost:
-
- - - - - - - - $2,260 - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
gal
$2,260
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,142
Cost:
$600
$1,142 16,413 - - - - - - - - $1,142
16,413
kWh
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,031
Cost:
$5,000
$3,096 33,998 $(-1,065) (-145) - - - - - - $3,096
33,998
kWh
$(-1,065)
(-145)
MMBtu
-
-
gal
-
-
gal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$218
Cost:
$300
$218 3,224 - - - - - - - - $218
3,224
kWh
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$13,785
Cost:
$5,380
- - - - - - $13,785 5,695 - - -
-
kWh
-
-
MMBtu
-
-
gal
$13,785
5,695
gal
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$288
Cost:
-
- - - - $288 300 - - - - -
-
kWh
-
-
MMBtu
$288
300
gal
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$29,958
Cost:
$42,307
$9,230 95,253 $(-1,065) (-145) $288 300 $13,785 5,695 $7,720 - $9,230
95,253
kWh
$(-1,065)
(-145)
MMBtu
$288
300
gal
$13,785
5,695
gal
$7,720
-
$
TOTAL IMPLEMENTED Savings:
$5,433
Cost:
$5,600
$4,238 50,411 $(-1,065) (-145) - - - - $2,260 - $4,238
50,411
kWh
$(-1,065)
(-145)
MMBtu
-
-
gal
-
-
gal
$2,260
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ gal $ $
Electricity Usage LPG Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Electricity Usage LPG Other Liquid (non-haz) Other Liquid (haz) Administrative Changes