IAC logo
IAC Assessment: ME0178
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product Shoes
NAICS n/a
SIC 3143 - Men's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 32,983
Annual Production 472,000 Pieces
Production Hrs. Annual 2,250
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,298 936,987 kWh $0.07
Electricity Demand $40,070 4,851 kW-months/year $8.26
Electricity Fees $1,108 - $ -
Fuel Oil #2 $4,478 947 MMBtu $4.73
TOTAL ENERGY COSTS $111,954
RECOMMENDED SAVINGS* $32,162 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,162
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,275
Cost:
$44,351
$12,791 115,475 $7,484 568 - - $12,791
115,475
kWh
$7,484
568
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,098
Cost:
$4,000
$3,771 53,927 $2,450 295 $(-1,123) (-245) $3,771
53,927
kWh
$2,450
295
kW-months/year
$(-1,123)
(-245)
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,576
Cost:
$1,839
$2,521 35,756 $2,041 216 $(-986) (-153) $2,521
35,756
kWh
$2,041
216
kW-months/year
$(-986)
(-153)
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,619
Cost:
$2,930
$1,619 22,860 - - - - $1,619
22,860
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,224
Cost:
$928
$1,224 17,585 - - - - $1,224
17,585
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$370
Cost:
$400
$370 5,275 - - - - $370
5,275
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$32,162
Cost:
$54,448
$22,296 250,878 $11,975 1,079 $(-2,109) (-398) $22,296
250,878
kWh
$11,975
1,079
kW-months/year
$(-2,109)
(-398)
MMBtu
TOTAL IMPLEMENTED Savings:
$32,162
Cost:
$54,448
$22,296 250,878 $11,975 1,079 $(-2,109) (-398) $22,296
250,878
kWh
$11,975
1,079
kW-months/year
$(-2,109)
(-398)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu