Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1996 |
Principal Product | Millwork |
NAICS | n/a |
SIC | 2541 - Wood Partitions And Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 59,625 |
Annual Production | 20,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,512 | 712,192 | kWh | $0.07 |
Electricity Demand | $18,964 | 2,328 | kW-months/year | $8.15 |
Electricity Fees | $415 | - | $ | - |
LPG | $10,039 | 1,319 | MMBtu | $7.61 |
TOTAL ENERGY COSTS | $100,828 | |||
RECOMMENDED SAVINGS* | $13,518 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,518 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,017 Cost: $11,793 |
$2,823 | 40,152 | $1,194 | 146 | - | - | - | - | - | - |
$2,823 40,152 kWh |
$1,194 146 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,210 Cost: $8,250 |
$1,210 | 17,292 | - | - | - | - | - | - | - | - |
$1,210 17,292 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,212 Cost: $930 |
- | - | - | - | $1,212 | 159 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,212 159 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $1,716 Cost: - |
- | - | - | - | - | - | - | - | $1,716 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$1,716 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $1,068 Cost: - |
- | - | - | - | - | - | - | - | $1,068 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$1,068 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,687 Cost: $100 |
$1,687 | 24,033 | - | - | - | - | - | - | - | - |
$1,687 24,033 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $449 Cost: $1,000 |
$449 | 6,448 | - | - | - | - | - | - | - | - |
$449 6,448 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $350 Cost: $350 |
$350 | 7,327 | - | - | - | - | - | - | - | - |
$350 7,327 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $209 Cost: $100 |
$209 | 2,931 | - | - | - | - | - | - | - | - |
$209 2,931 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,600 Cost: - |
- | - | - | - | - | - | $1,600 | 5,600 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,600 5,600 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $13,518 Cost: $22,523 |
$6,728 | 98,183 | $1,194 | 146 | $1,212 | 159 | $1,600 | 5,600 | $2,784 | - | $6,728 98,183 kWh |
$1,194 146 kW-months/year |
$1,212 159 MMBtu |
$1,600 5,600 lb |
$2,784 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,518 Cost: $22,523 |
$6,728 | 98,183 | $1,194 | 146 | $1,212 | 159 | $1,600 | 5,600 | $2,784 | - | $6,728 98,183 kWh |
$1,194 146 kW-months/year |
$1,212 159 MMBtu |
$1,600 5,600 lb |
$2,784 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Ancillary Material Cost |