Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1996 |
Principal Product | Sky Lights |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 45,500 |
Annual Production | 40,000 Units |
Production Hrs. Annual | 2,000 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $87,074 | 1,203,986 | kWh | $0.07 |
Electricity Demand | $75,934 | 7,884 | kW-months/year | $9.63 |
Electricity Fees | $3,054 | - | $ | - |
Fuel Oil #6 | $36,385 | 12,326 | MMBtu | $2.95 |
TOTAL ENERGY COSTS | $213,646 | |||
RECOMMENDED SAVINGS* | $32,301 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,928 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,346 Cost: $5,000 |
$1,523 | 21,688 | $4,113 | 408 | $(-290) | (-99) | - | - | - | - | - | - | - | - |
$1,523 21,688 kWh |
$4,113 408 kW-months/year |
$(-290) (-99) MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,017 Cost: $11,793 |
$2,823 | 40,445 | $1,194 | 147 | - | - | - | - | - | - | - | - | - | - |
$2,823 40,445 kWh |
$1,194 147 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF |
Savings: $2,188 Cost: $180 |
$1,086 | 7,327 | $1,102 | 30 | - | - | - | - | - | - | - | - | - | - |
$1,086 7,327 kWh |
$1,102 30 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $938 Cost: $195 |
$938 | 13,482 | - | - | - | - | - | - | - | - | - | - | - | - |
$938 13,482 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $617 Cost: $700 |
$617 | 8,792 | - | - | - | - | - | - | - | - | - | - | - | - |
$617 8,792 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $356 Cost: $359 |
$356 | 5,275 | - | - | - | - | - | - | - | - | - | - | - | - |
$356 5,275 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $345 Cost: $800 |
$345 | 4,982 | - | - | - | - | - | - | - | - | - | - | - | - |
$345 4,982 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $14,359 Cost: $10,247 |
- | - | - | - | - | - | - | - | $8,077 | 359,000 | $6,282 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$8,077 359,000 lb |
$6,282 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $4,135 Cost: $20,220 |
- | - | - | - | - | - | $1,734 | 1,242,436 | - | - | - | - | $2,401 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,734 1,242,436 gal |
- - lb |
- - $ |
$2,401 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,301 Cost: $49,494 |
$7,688 | 101,991 | $6,409 | 585 | $(-290) | (-99) | $1,734 | 1,242,436 | $8,077 | 359,000 | $6,282 | - | $2,401 | - | $7,688 101,991 kWh |
$6,409 585 kW-months/year |
$(-290) (-99) MMBtu |
$1,734 1,242,436 gal |
$8,077 359,000 lb |
$6,282 - $ |
$2,401 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,928 Cost: $37,342 |
$4,509 | 56,271 | $5,215 | 438 | $(-290) | (-99) | $1,734 | 1,242,436 | $8,077 | 359,000 | $6,282 | - | $2,401 | - | $4,509 56,271 kWh |
$5,215 438 kW-months/year |
$(-290) (-99) MMBtu |
$1,734 1,242,436 gal |
$8,077 359,000 lb |
$6,282 - $ |
$2,401 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #6 | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption |