Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product plastic cutlery
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 45,900
Annual Production 17,120,000 Pounds
Production Hrs. Annual 8,760
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $561,141 11,361,079 kWh $0.05
Electricity Demand $134,744 21,744 kW-months/year $6.20
Electricity Fees $9,935 - $ -
LPG $10,861 1,368 MMBtu $7.94
TOTAL ENERGY COSTS $716,681
RECOMMENDED SAVINGS* $16,423 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,168
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,103
Cost:
$9,087
- - - - - - $5,103 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,103
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,255
Cost:
$6,000
$2,255 45,135 - - - - - - $2,255
45,135
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,902
Cost:
$400
$2,902 57,737 - - - - - - $2,902
57,737
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,748
Cost:
-
- - - - - - $1,748 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,748
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,615
Cost:
$4,430
$1,380 27,550 $235 38 - - - - $1,380
27,550
kWh
$235
38
kW-months/year
-
-
lb
-
-
$
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$2,800
Cost:
-
- - - - $2,800 - - - -
-
kWh
-
-
kW-months/year
$2,800
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$16,423
Cost:
$19,917
$6,537 130,422 $235 38 $2,800 - $6,851 - $6,537
130,422
kWh
$235
38
kW-months/year
$2,800
-
lb
$6,851
-
$
TOTAL IMPLEMENTED Savings:
$14,168
Cost:
$13,917
$4,282 85,287 $235 38 $2,800 - $6,851 - $4,282
85,287
kWh
$235
38
kW-months/year
$2,800
-
lb
$6,851
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $