Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1996 |
Principal Product | newspapers |
NAICS | n/a |
SIC | 2711 - Newspapers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 274 |
Plant Area (Sq.Ft.) | 44,000 |
Annual Production | 8,221,454 Pounds |
Production Hrs. Annual | 7,300 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $109,131 | 1,512,016 | kWh | $0.07 |
Electricity Demand | $33,136 | 3,758 | kW-months/year | $8.82 |
Electricity Fees | $1,865 | - | $ | - |
Fuel Oil #2 | $909 | 195 | MMBtu | $4.66 |
Fuel Oil #6 | $18,274 | 8,816 | MMBtu | $2.07 |
TOTAL ENERGY COSTS | $163,315 | |||
RECOMMENDED SAVINGS* | $14,856 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,610 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,571 Cost: $18,242 |
$4,597 | 65,358 | $974 | 110 | - | - | - | - |
$4,597 65,358 kWh |
$974 110 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,836 Cost: $600 |
$2,836 | 40,445 | - | - | - | - | - | - |
$2,836 40,445 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,160 Cost: $100 |
- | - | - | - | $2,160 | 1,044 | - | - |
- - kWh |
- - kW-months/year |
$2,160 1,044 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,921 Cost: - |
$1,921 | 27,550 | - | - | - | - | - | - |
$1,921 27,550 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,018 Cost: $1,050 |
$1,018 | 14,654 | - | - | - | - | - | - |
$1,018 14,654 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $675 Cost: $930 |
- | - | - | - | $675 | 250 | - | - |
- - kWh |
- - kW-months/year |
$675 250 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $675 Cost: - |
- | - | - | - | - | - | $675 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$675 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,856 Cost: $20,922 |
$10,372 | 148,007 | $974 | 110 | $2,835 | 1,294 | $675 | - | $10,372 148,007 kWh |
$974 110 kW-months/year |
$2,835 1,294 MMBtu |
$675 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,610 Cost: $2,680 |
$5,775 | 82,649 | - | - | $2,835 | 1,294 | - | - | $5,775 82,649 kWh |
- - kW-months/year |
$2,835 1,294 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) |