IAC logo
IAC Assessment: ME0198
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0198
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product Toothpicks
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 86,016
Annual Production 3,300,100 Pounds
Production Hrs. Annual 8,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,780 237,691 kWh $0.06
Electricity Demand $23,564 2,465 kW-months/year $9.56
Electricity Fees $5,407 - $ -
Wood $124,800 44,928 MMBtu $2.78
TOTAL ENERGY COSTS $175,824
RECOMMENDED SAVINGS* $51,839 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,638
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$24,412
Cost:
$4,200
$24,412 348,769 - - - - - - - - $24,412
348,769
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,122
Cost:
$8,122
$6,998 101,114 $1,124 128 - - - - - - $6,998
101,114
kWh
$1,124
128
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,460
Cost:
$3,253
$3,460 49,531 - - - - - - - - $3,460
49,531
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,150
Cost:
$2,150
- - - - $2,150 827 - - - - -
-
kWh
-
-
kW-months/year
$2,150
827
MMBtu
-
-
lb
-
-
$
05: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$1,800
Cost:
$1,800
- - - - - - - - $1,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,800
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,044
Cost:
$1,044
$1,044 14,947 - - - - - - - - $1,044
14,947
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,206
Cost:
$1,034
$1,206 17,292 - - - - - - - - $1,206
17,292
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,789
Cost:
$500
- - - - $8,784 3,292 $5 2,120 - - -
-
kWh
-
-
kW-months/year
$8,784
3,292
MMBtu
$5
2,120
lb
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$856
Cost:
$646
- - - - $855 224 $1 142 - - -
-
kWh
-
-
kW-months/year
$855
224
MMBtu
$1
142
lb
-
-
$
TOTAL RECOMMENDED Savings:
$51,839
Cost:
$22,749
$37,120 531,653 $1,124 128 $11,789 4,343 $6 2,262 $1,800 - $37,120
531,653
kWh
$1,124
128
kW-months/year
$11,789
4,343
MMBtu
$6
2,262
lb
$1,800
-
$
TOTAL IMPLEMENTED Savings:
$18,638
Cost:
$18,049
$12,708 182,884 $1,124 128 $3,005 1,051 $1 142 $1,800 - $12,708
182,884
kWh
$1,124
128
kW-months/year
$3,005
1,051
MMBtu
$1
142
lb
$1,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes