IAC Assessment: ME0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product Wooden Reels
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 170
Plant Area (Sq.Ft.) 12,180
Annual Production 390,000 Pieces
Production Hrs. Annual 4,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $301,022 5,083,529 kWh $0.06
Electricity Demand $106,347 16,707 kW-months/year $6.37
Electricity Fees $6,067 - $ -
Wood $11,610 3,339 MMBtu $3.48
TOTAL ENERGY COSTS $425,046
RECOMMENDED SAVINGS* $15,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,706
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,316
Cost:
-
$4,215 60,082 $1,101 173 - - - - - - - - - - - - $4,215
60,082
kWh
$1,101
173
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$2,884
Cost:
-
- - - - - - - - - - $2,884 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$2,884
-
$
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,211
Cost:
-
$1,211 17,292 - - - - - - - - - - - - - - $1,211
17,292
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 4.452 ELIMINATE SHIFT Savings:
$1,125
Cost:
-
- - - - - - - - - - $1,125 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$1,125
-
$
-
-
$
-
-
Tgal
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,071
Cost:
-
- - - - - - - - - - $1,071 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$1,071
-
$
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,030
Cost:
$2,544
$374 6,155 $119 19 - - - - $153 - - - $384 - - - $374
6,155
kWh
$119
19
kW-months/year
-
-
MMBtu
-
-
Tgal
$153
-
$
-
-
$
$384
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$856
Cost:
-
$856 14,361 - - - - - - - - - - - - - - $856
14,361
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$455
Cost:
-
- - - - $455 207 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$455
207
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
09: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$346
Cost:
-
- - - - $346 270 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$346
270
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$313
Cost:
-
$313 4,396 - - - - - - - - - - - - - - $313
4,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$302
Cost:
-
- - - - $302 137 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$302
137
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$264
Cost:
-
- - - - $264 120 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$264
120
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
13: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$105
Cost:
-
- - - - - - - - - - $105 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$105
-
$
-
-
$
-
-
Tgal
14: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$133
Cost:
-
- - - - - - - - - - $133 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$133
-
$
-
-
$
-
-
Tgal
15: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$295
Cost:
-
- - - - $132 60 $45 65,700 - - - - - - $118 - -
-
kWh
-
-
kW-months/year
$132
60
MMBtu
$45
65,700
Tgal
-
-
$
-
-
$
-
-
$
$118
-
Tgal
TOTAL RECOMMENDED Savings:
$15,706
Cost:
$2,544
$6,969 102,286 $1,220 192 $1,499 794 $45 65,700 $153 - $5,318 - $384 - $118 - $6,969
102,286
kWh
$1,220
192
kW-months/year
$1,499
794
MMBtu
$45
65,700
Tgal
$153
-
$
$5,318
-
$
$384
-
$
$118
-
Tgal
TOTAL IMPLEMENTED Savings:
$15,706
Cost:
$2,544
$6,969 102,286 $1,220 192 $1,499 794 $45 65,700 $153 - $5,318 - $384 - $118 - $6,969
102,286
kWh
$1,220
192
kW-months/year
$1,499
794
MMBtu
$45
65,700
Tgal
$153
-
$
$5,318
-
$
$384
-
$
$118
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption