Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1996 |
Principal Product | Ice cream sticks |
NAICS | n/a |
SIC | 2499 - Wood Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $86,909 | 1,203,107 | kWh | $0.07 |
Electricity Demand | $23,293 | 2,745 | kW-months/year | $8.49 |
Electricity Fees | $1,141 | - | $ | - |
Fuel Oil #4 | $15,578 | 3,592 | MMBtu | $4.34 |
TOTAL ENERGY COSTS | $129,321 | |||
RECOMMENDED SAVINGS* | $28,318 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,555 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Water Consumption | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES |
Savings: $5,616 Cost: $290 |
$5,616 | 80,305 | - | - | - | - | - | - | - | - | - | - |
$5,616 80,305 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,536 Cost: $21,778 |
$4,298 | 61,254 | $1,238 | 42 | - | - | - | - | - | - | - | - |
$4,298 61,254 kWh |
$1,238 42 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,575 Cost: $3,600 |
$1,575 | 22,567 | - | - | - | - | - | - | - | - | - | - |
$1,575 22,567 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,182 Cost: $600 |
$1,182 | 16,999 | - | - | - | - | - | - | - | - | - | - |
$1,182 16,999 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $759 Cost: $500 |
$759 | 10,844 | - | - | - | - | - | - | - | - | - | - |
$759 10,844 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $147 Cost: $192 |
- | - | - | - | $147 | 34 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$147 34 MMBtu |
- - lb |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $9,374 Cost: $4,932 |
- | - | - | - | - | - | $2,400 | 1,214,000 | - | - | $6,974 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,400 1,214,000 lb |
- - Tgal |
$6,974 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,129 Cost: $1,282 |
$2,419 | 34,584 | $407 | 27 | $1,263 | 232 | - | - | $40 | - | - | - |
$2,419 34,584 kWh |
$407 27 kW-months/year |
$1,263 232 MMBtu |
- - lb |
$40 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,318 Cost: $33,174 |
$15,849 | 226,553 | $1,645 | 69 | $1,410 | 266 | $2,400 | 1,214,000 | $40 | - | $6,974 | - | $15,849 226,553 kWh |
$1,645 69 kW-months/year |
$1,410 266 MMBtu |
$2,400 1,214,000 lb |
$40 - Tgal |
$6,974 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,555 Cost: $32,692 |
$10,233 | 146,248 | $1,645 | 69 | $1,263 | 232 | $2,400 | 1,214,000 | $40 | - | $6,974 | - | $10,233 146,248 kWh |
$1,645 69 kW-months/year |
$1,263 232 MMBtu |
$2,400 1,214,000 lb |
$40 - Tgal |
$6,974 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Water Consumption | By-product Production |