IAC logo
IAC Assessment: ME0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product Clothespins
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 48,000
Annual Production 3,162,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,040 1,622,509 kWh $0.06
Electricity Demand $51,152 7,668 kW-months/year $6.67
Electricity Fees $8,831 - $ -
TOTAL ENERGY COSTS $156,023
RECOMMENDED SAVINGS* $104,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,686
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Water Consumption By-product Production Electricity Usage Electricity Demand Administrative Changes Water Consumption By-product Production
$ kWh $ kW-months/year $ $ $ Tgal $ $
01: 4.443 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM Savings:
$80,000
Cost:
$212,393
- - - - $80,000 - - - - - -
-
kWh
-
-
kW-months/year
$80,000
-
$
-
-
Tgal
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$10,488
Cost:
-
- - - - $10,488 - - - - - -
-
kWh
-
-
kW-months/year
$10,488
-
$
-
-
Tgal
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$8,736
Cost:
-
- - - - $8,736 - - - - - -
-
kWh
-
-
kW-months/year
$8,736
-
$
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,760
Cost:
$600
$3,760 62,720 - - - - - - - - $3,760
62,720
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$580
Cost:
$765
$196 3,224 $384 58 - - - - - - $196
3,224
kWh
$384
58
kW-months/year
-
-
$
-
-
Tgal
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$386
Cost:
$1,032
$386 6,448 - - - - - - - - $386
6,448
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$267
Cost:
$60
$161 4,396 - - - - $106 - - - $161
4,396
kWh
-
-
kW-months/year
-
-
$
$106
-
Tgal
-
-
$
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$168
Cost:
$2,200
- - - - - - - - $168 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$168
-
$
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$37
Cost:
$300
- - - - - - - - $37 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$37
-
$
TOTAL RECOMMENDED Savings:
$104,422
Cost:
$217,350
$4,503 76,788 $384 58 $99,224 - $106 - $205 - $4,503
76,788
kWh
$384
58
kW-months/year
$99,224
-
$
$106
-
Tgal
$205
-
$
TOTAL IMPLEMENTED Savings:
$95,686
Cost:
$217,350
$4,503 76,788 $384 58 $90,488 - $106 - $205 - $4,503
76,788
kWh
$384
58
kW-months/year
$90,488
-
$
$106
-
Tgal
$205
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $
Electricity Usage Electricity Demand Administrative Changes Water Consumption By-product Production Electricity Usage Electricity Demand Administrative Changes Water Consumption By-product Production