Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1996 |
Principal Product | Canned Sardines |
NAICS | n/a |
SIC | 2091 - Canned And Cured Fish And Seafoods |
Sales | $5,000,000-$10,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 37,691 |
Annual Production | 200,000 Units |
Production Hrs. Annual | 3,400 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,340 | 1,472,157 | kWh | $0.07 |
Electricity Demand | $34,436 | 3,945 | kW-months/year | $8.73 |
Electricity Fees | $15,565 | - | $ | - |
Fuel Oil #6 | $49,567 | 16,044 | MMBtu | $3.09 |
TOTAL ENERGY COSTS | $199,908 | |||
RECOMMENDED SAVINGS* | $141,917 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $133,456 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Personnel Changes | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Fuel Oil #6 | Personnel Changes | Water Consumption | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.453 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION |
Savings: $115,428 Cost: - |
- | - | - | - | - | - | $(-447,072) | - | - | - | $562,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$(-447,072) - $ |
- - Tgal |
$562,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,183 Cost: $7,572 |
$1,694 | 24,326 | $489 | 56 | - | - | - | - | - | - | - | - |
$1,694 24,326 kWh |
$489 56 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $1,380 Cost: $453 |
$990 | 14,068 | $390 | 45 | - | - | - | - | - | - | - | - |
$990 14,068 kWh |
$390 45 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,004 Cost: $2,112 |
- | - | - | - | $1,004 | 265 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,004 265 MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,306 Cost: $595 |
$1,306 | 23,154 | - | - | - | - | - | - | - | - | - | - |
$1,306 23,154 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $285 Cost: $200 |
$285 | 4,103 | - | - | - | - | - | - | - | - | - | - |
$285 4,103 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $244 Cost: $38 |
$183 | 2,638 | - | - | $61 | 20 | - | - | - | - | - | - |
$183 2,638 kWh |
- - kW-months/year |
$61 20 MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $196 Cost: $270 |
$196 | 5,569 | - | - | - | - | - | - | - | - | - | - |
$196 5,569 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $11,040 Cost: $200 |
- | - | - | - | $10,530 | 3,475 | - | - | $510 | - | - | - |
- - kWh |
- - kW-months/year |
$10,530 3,475 MMBtu |
- - $ |
$510 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4151 MINIMIZE WATER USAGE |
Savings: $2,844 Cost: $2,302 |
$783 | 11,137 | $1,173 | 134 | $685 | 226 | - | - | $203 | - | - | - |
$783 11,137 kWh |
$1,173 134 kW-months/year |
$685 226 MMBtu |
- - $ |
$203 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $2,370 Cost: $2,400 |
- | - | - | - | - | - | - | - | $2,370 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$2,370 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,946 Cost: $3,800 |
- | - | - | - | - | - | - | - | $1,946 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$1,946 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,236 Cost: $75 |
$1,008 | 14,361 | - | - | - | - | - | - | $228 | - | - | - |
$1,008 14,361 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$228 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.4151 MINIMIZE WATER USAGE |
Savings: $455 Cost: $415 |
- | - | - | - | - | - | - | - | $455 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$455 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $141,917 Cost: $20,432 |
$6,445 | 99,356 | $2,052 | 235 | $12,280 | 3,986 | $(-447,072) | - | $5,712 | - | $562,500 | - | $6,445 99,356 kWh |
$2,052 235 kW-months/year |
$12,280 3,986 MMBtu |
$(-447,072) - $ |
$5,712 - Tgal |
$562,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $133,456 Cost: $10,657 |
$4,149 | 62,134 | $1,662 | 190 | $11,276 | 3,721 | $(-447,072) | - | $941 | - | $562,500 | - | $4,149 62,134 kWh |
$1,662 190 kW-months/year |
$11,276 3,721 MMBtu |
$(-447,072) - $ |
$941 - Tgal |
$562,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Personnel Changes | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Fuel Oil #6 | Personnel Changes | Water Consumption | Primary Product |