IAC logo
IAC Assessment: ME0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1997
Principal Product electric heaters
NAICS n/a
SIC 3634 - Electric Housewares And Fans
Sales $5,000,000-$10,000,000
# of Employees 135
Plant Area (Sq.Ft.) 57,000
Annual Production 20,000 Units
Production Hrs. Annual 4,200
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,370 961,020 kWh $0.07
Electricity Demand $20,696 3,024 kW-months/year $6.84
Electricity Fees $5,497 - $ -
LPG $708 54 MMBtu $13.11
Fuel Oil #2 $17,146 3,439 MMBtu $4.99
TOTAL ENERGY COSTS $111,228
RECOMMENDED SAVINGS* $32,076 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,157
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,045
Cost:
$25,615
$6,891 98,476 $2,154 311 - - - - - - - - - - - - $6,891
98,476
kWh
$2,154
311
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,936
Cost:
$4,075
$2,723 38,980 $2,071 299 - - $(-858) (-166) - - - - - - - - $2,723
38,980
kWh
$2,071
299
kW-months/year
-
-
MMBtu
$(-858)
(-166)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,494
Cost:
$8,000
$3,029 43,376 $1,081 156 $(-1,616) (-164) - - - - - - - - - - $3,029
43,376
kWh
$1,081
156
kW-months/year
$(-1,616)
(-164)
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 4.6230 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME Savings:
$1,800
Cost:
$1,500
- - - - - - - - - - $1,800 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$1,800
-
$
-
-
$
-
-
Tgal
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,361
Cost:
-
- - - - - - - - - - $1,361 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$1,361
-
$
-
-
$
-
-
Tgal
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,128
Cost:
$2,300
- - - - - - - - - - $1,128 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$1,128
-
$
-
-
$
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$642
Cost:
$325
$642 9,086 - - - - - - - - - - - - - - $642
9,086
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$358
Cost:
$500
$358 4,982 - - - - - - - - - - - - - - $358
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$120
Cost:
-
- - - - - - - - - - $120 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$120
-
$
-
-
$
-
-
Tgal
10: 3.4151 MINIMIZE WATER USAGE Savings:
$5,298
Cost:
$600
- - - - - - - - - - - - - - $5,298 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$5,298
-
Tgal
11: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$4,029
Cost:
$12,577
- - - - - - - - $4,029 4,800 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$4,029
4,800
lb
-
-
$
-
-
$
-
-
Tgal
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,079
Cost:
$6,200
- - - - - - - - $1,079 10,400 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,079
10,400
lb
-
-
$
-
-
$
-
-
Tgal
13: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$786
Cost:
$525
- - - - - - - - - - - - $786 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
$786
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$32,076
Cost:
$62,217
$13,643 194,900 $5,306 766 $(-1,616) (-164) $(-858) (-166) $5,108 15,200 $4,409 - $786 - $5,298 - $13,643
194,900
kWh
$5,306
766
kW-months/year
$(-1,616)
(-164)
MMBtu
$(-858)
(-166)
MMBtu
$5,108
15,200
lb
$4,409
-
$
$786
-
$
$5,298
-
Tgal
TOTAL IMPLEMENTED Savings:
$23,157
Cost:
$47,842
$7,891 112,544 $2,154 311 - - - - $5,108 15,200 $1,920 - $786 - $5,298 - $7,891
112,544
kWh
$2,154
311
kW-months/year
-
-
MMBtu
-
-
MMBtu
$5,108
15,200
lb
$1,920
-
$
$786
-
$
$5,298
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption