Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1997 |
Principal Product | Oriented Strand Board |
NAICS | n/a |
SIC | 2493 - Reconstituted Wood Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 112 |
Plant Area (Sq.Ft.) | 129,600 |
Annual Production | 290,400 Thousand Feet |
Production Hrs. Annual | 8,712 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,451,746 | 31,491,208 | kWh | $0.05 |
Electricity Demand | $390,478 | 49,054 | kW-months/year | $7.96 |
Electricity Fees | $4,993 | - | $ | - |
LPG | $620,951 | 104,531 | MMBtu | $5.94 |
Fuel Oil #2 | $42,808 | 8,981 | MMBtu | $4.77 |
Wood | $312,251 | 439,474 | MMBtu | $0.71 |
TOTAL ENERGY COSTS | $2,854,300 | |||
RECOMMENDED SAVINGS* | $42,953 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,773 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $9,522 Cost: $18,574 |
- | - | - | - | $9,522 | 13,412 | - | - |
- - kWh |
- - kW-months/year |
$9,522 13,412 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $7,349 Cost: $979 |
$6,352 | 127,198 | $1,433 | 180 | $(-436) | (-614) | - | - |
$6,352 127,198 kWh |
$1,433 180 kW-months/year |
$(-436) (-614) MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,413 Cost: $9,426 |
$4,472 | 89,390 | $941 | 118 | - | - | - | - |
$4,472 89,390 kWh |
$941 118 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,285 Cost: $330 |
$3,285 | 65,651 | - | - | - | - | - | - |
$3,285 65,651 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,736 Cost: $1,233 |
- | - | - | - | $1,736 | 2,445 | - | - |
- - kWh |
- - kW-months/year |
$1,736 2,445 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $1,268 Cost: - |
$408 | 8,206 | $860 | 108 | - | - | - | - |
$408 8,206 kWh |
$860 108 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,102 Cost: $1,308 |
$1,102 | 21,981 | - | - | - | - | - | - |
$1,102 21,981 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $488 Cost: $215 |
$488 | 9,672 | - | - | - | - | - | - |
$488 9,672 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $12,790 Cost: $10,531 |
- | - | - | - | - | - | $12,790 | 2,558 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,790 2,558 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,953 Cost: $42,596 |
$16,107 | 322,098 | $3,234 | 406 | $10,822 | 15,243 | $12,790 | 2,558 | $16,107 322,098 kWh |
$3,234 406 kW-months/year |
$10,822 15,243 MMBtu |
$12,790 2,558 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,773 Cost: $545 |
$3,773 | 75,323 | - | - | - | - | - | - | $3,773 75,323 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) |