Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1997 |
Principal Product | Surface Mount Capacitors |
NAICS | n/a |
SIC | 3675 - Electronic Capacitors |
Sales | $10,000,000-$50,000,000 |
# of Employees | 275 |
Plant Area (Sq.Ft.) | 73,000 |
Annual Production | 6,500 Pieces |
Production Hrs. Annual | 6,250 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $392,954 | 5,822,099 | kWh | $0.07 |
Electricity Demand | $93,585 | 11,358 | kW-months/year | $8.24 |
Electricity Fees | $12,447 | - | $ | - |
LPG | $267 | 9 | MMBtu | $29.67 |
Fuel Oil #2 | $64,384 | 12,601 | MMBtu | $5.11 |
TOTAL ENERGY COSTS | $581,327 | |||
RECOMMENDED SAVINGS* | $77,068 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $68,903 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $47,583 Cost: $18,145 |
$68,924 | 985,053 | - | - | $(-21,341) | (-4,201) | - | - | - | - | - | - |
$68,924 985,053 kWh |
- - kW-months/year |
$(-21,341) (-4,201) MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $10,674 Cost: $5,557 |
$8,693 | 123,974 | $1,981 | 241 | - | - | - | - | - | - | - | - |
$8,693 123,974 kWh |
$1,981 241 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $4,198 Cost: $1,666 |
$5,810 | 82,943 | $444 | 54 | $(-2,056) | (-405) | - | - | - | - | - | - |
$5,810 82,943 kWh |
$444 54 kW-months/year |
$(-2,056) (-405) MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,967 Cost: $650 |
$3,967 | 81,477 | - | - | - | - | - | - | - | - | - | - |
$3,967 81,477 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,067 Cost: $279 |
- | - | - | - | $3,067 | 419 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,067 419 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $965 Cost: $250 |
$965 | 13,775 | - | - | - | - | - | - | - | - | - | - |
$965 13,775 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT |
Savings: $3,640 Cost: $5,000 |
- | - | - | - | - | - | - | - | $3,640 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$3,640 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $2,760 Cost: - |
- | - | - | - | - | - | $2,760 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,760 - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $214 Cost: $1,850 |
$(-421) | (-6,155) | $(-203) | (-8) | - | - | $641 | 210,469 | - | - | $197 | - |
$(-421) (-6,155) kWh |
$(-203) (-8) kW-months/year |
- - MMBtu |
$641 210,469 Tgal |
- - $ |
$197 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $77,068 Cost: $33,397 |
$87,938 | 1,281,067 | $2,222 | 287 | $(-20,330) | (-4,187) | $3,401 | 210,469 | $3,640 | - | $197 | - | $87,938 1,281,067 kWh |
$2,222 287 kW-months/year |
$(-20,330) (-4,187) MMBtu |
$3,401 210,469 Tgal |
$3,640 - $ |
$197 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $68,903 Cost: $31,081 |
$78,161 | 1,116,647 | $1,778 | 233 | $(-18,274) | (-3,782) | $3,401 | 210,469 | $3,640 | - | $197 | - | $78,161 1,116,647 kWh |
$1,778 233 kW-months/year |
$(-18,274) (-3,782) MMBtu |
$3,401 210,469 Tgal |
$3,640 - $ |
$197 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Ancillary Material Cost | Water Consumption |