IAC logo
IAC Assessment: ME0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product Jet Engine Parts
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $5,000,000-$10,000,000
# of Employees 87
Plant Area (Sq.Ft.) 75,000
Annual Production 2,300 Pieces
Production Hrs. Annual 8,760
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,633 1,362,251 kWh $0.07
Electricity Demand $7,668 3,121 kW-months/year $2.46
Electricity Fees $2,843 - $ -
LPG $23,151 2,692 MMBtu $8.60
TOTAL ENERGY COSTS $135,785
RECOMMENDED SAVINGS* $20,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,334
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Other Liquid (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.7244 REVISE SMOKE CLEANUP FROM OPERATIONS Savings:
$2,943
Cost:
$500
$2,943 42,204 - - - - - - - - - - $2,943
42,204
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,780
Cost:
$10,015
$1,847 26,377 $933 9 - - - - - - - - $1,847
26,377
kWh
$933
9
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,507
Cost:
-
- - - - - - - - $1,507 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,507
-
$
-
-
$
04: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$104
Cost:
-
- - - - - - - - $104 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$104
-
$
-
-
$
05: 3.8133 CONVERT TO AQUEOUS CLEANING Savings:
$10,101
Cost:
$46,354
$(-137) (-2,052) - - $(-2,497) (-305) $151 (-4) - - $12,584 - $(-137)
(-2,052)
kWh
-
-
kW-months/year
$(-2,497)
(-305)
MMBtu
$151
(-4)
gal
-
-
$
$12,584
-
$
06: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$2,740
Cost:
$3,500
- - - - - - $2,740 1,412 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,740
1,412
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,175
Cost:
$60,369
$4,653 66,529 $933 9 $(-2,497) (-305) $2,891 1,408 $1,611 - $12,584 - $4,653
66,529
kWh
$933
9
kW-months/year
$(-2,497)
(-305)
MMBtu
$2,891
1,408
gal
$1,611
-
$
$12,584
-
$
TOTAL IMPLEMENTED Savings:
$7,334
Cost:
$10,515
$4,790 68,581 $933 9 - - - - $1,611 - - - $4,790
68,581
kWh
$933
9
kW-months/year
-
-
MMBtu
-
-
gal
$1,611
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand LPG Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Other Liquid (haz) Administrative Changes Ancillary Material Cost