IAC logo
IAC Assessment: ME0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product Footwear
NAICS n/a
SIC 3143 - Men's Footwear, Except Athletic
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 161,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $337,439 4,814,771 kWh $0.07
Electricity Demand $160,899 30,115 kW-months/year $5.34
Electricity Fees $27,475 - $ -
LPG $144 7 MMBtu $20.57
Fuel Oil #2 $46,538 7,979 MMBtu $5.83
Fuel Oil #4 $59,077 12,891 MMBtu $4.58
TOTAL ENERGY COSTS $631,626
RECOMMENDED SAVINGS* $82,799 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,304
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$45,000
Cost:
$150,000
- - - - - - - - $45,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$45,000
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,132
Cost:
$46,836
$14,047 200,469 $6,085 573 - - - - - - $14,047
200,469
kWh
$6,085
573
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$6,992
Cost:
$31,060
- - - - - - - - $6,992 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$6,992
-
$
04: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$4,542
Cost:
$11,495
- - - - - - - - $4,542 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,542
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,336
Cost:
$300
$2,336 33,411 - - - - - - - - $2,336
33,411
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$1,083
Cost:
$4,178
- - - - $1,083 185 - - - - -
-
kWh
-
-
kW-months/year
$1,083
185
MMBtu
-
-
lb
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$868
Cost:
$858
$868 12,309 - - - - - - - - $868
12,309
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$562
Cost:
-
$562 7,913 - - - - - - - - $562
7,913
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$804
Cost:
$1,500
$804 40,445 - - - - - - - - $804
40,445
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$406
Cost:
$122
- - - - $406 83 - - - - -
-
kWh
-
-
kW-months/year
$406
83
MMBtu
-
-
lb
-
-
$
11: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$74
Cost:
-
- - - - - - $74 2,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$74
2,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$82,799
Cost:
$246,349
$18,617 294,547 $6,085 573 $1,489 268 $74 2,000 $56,534 - $18,617
294,547
kWh
$6,085
573
kW-months/year
$1,489
268
MMBtu
$74
2,000
lb
$56,534
-
$
TOTAL IMPLEMENTED Savings:
$24,304
Cost:
$48,116
$17,813 254,102 $6,085 573 $406 83 - - - - $17,813
254,102
kWh
$6,085
573
kW-months/year
$406
83
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes