IAC Assessment: ME0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product storage and retrieval systems
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 48,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,210
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,025 535,756 kWh $0.07
Electricity Demand $17,154 2,030 kW-months/year $8.45
Electricity Fees $4,032 - $ -
Natural Gas $23,289 3,182 MMBtu $7.32
TOTAL ENERGY COSTS $89,187
RECOMMENDED SAVINGS* $19,553 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,161
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,934
Cost:
$2,500
$4,019 69,754 $304 36 $(-389) (-53) - - - - $4,019
69,754
kWh
$304
36
kW-months/year
$(-389)
(-53)
MMBtu
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,602
Cost:
$11,858
$2,637 37,808 $965 114 - - - - - - $2,637
37,808
kWh
$965
114
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$2,513
Cost:
$8,600
- - - - $2,513 343 - - - - -
-
kWh
-
-
kW-months/year
$2,513
343
MMBtu
-
-
gal
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,383
Cost:
-
- - - - - - - - $2,383 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,383
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,126
Cost:
$1,700
- - - - $1,126 123 - - - - -
-
kWh
-
-
kW-months/year
$1,126
123
MMBtu
-
-
gal
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$591
Cost:
$2,260
$245 3,517 $456 54 $(-110) (-15) - - - - $245
3,517
kWh
$456
54
kW-months/year
$(-110)
(-15)
MMBtu
-
-
gal
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$392
Cost:
$90
$392 5,862 - - - - - - - - $392
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
08: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$90
Cost:
$160
- - - - $90 12 - - - - -
-
kWh
-
-
kW-months/year
$90
12
MMBtu
-
-
gal
-
-
$
09: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,922
Cost:
$3,036
- - - - - - $4,922 984 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,922
984
gal
-
-
$
TOTAL RECOMMENDED Savings:
$19,553
Cost:
$30,204
$7,293 116,941 $1,725 204 $3,230 410 $4,922 984 $2,383 - $7,293
116,941
kWh
$1,725
204
kW-months/year
$3,230
410
MMBtu
$4,922
984
gal
$2,383
-
$
TOTAL IMPLEMENTED Savings:
$19,161
Cost:
$30,114
$6,901 111,079 $1,725 204 $3,230 410 $4,922 984 $2,383 - $6,901
111,079
kWh
$1,725
204
kW-months/year
$3,230
410
MMBtu
$4,922
984
gal
$2,383
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes