IAC Assessment: ME0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product Electro Plating Silver
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 29,500
Annual Production 8,500,000 Pieces
Production Hrs. Annual 4,420
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,488 1,937,866 kWh $0.07
Electricity Demand $43,312 12,531 kW-months/year $3.46
Electricity Fees $6,861 - $ -
Natural Gas $66,221 9,879 MMBtu $6.70
Fuel Oil #2 $49,136 10,143 MMBtu $4.84
TOTAL ENERGY COSTS $300,018
RECOMMENDED SAVINGS* $12,201 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,576
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,696
Cost:
-
$2,696 38,394 - - - - - - $2,696
38,394
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,163
Cost:
$5,970
$1,561 22,274 $602 66 - - - - $1,561
22,274
kWh
$602
66
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,398
Cost:
$400
$1,398 19,930 - - - - - - $1,398
19,930
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,127
Cost:
$3,000
$1,127 16,120 - - - - - - $1,127
16,120
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,051
Cost:
$2,000
$235 293 $918 34 $(-102) 1 - - $235
293
kWh
$918
34
kW-months/year
$(-102)
1
MMBtu
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$895
Cost:
$700
$590 8,499 $479 53 - - $(-174) (-36) $590
8,499
kWh
$479
53
kW-months/year
-
-
MMBtu
$(-174)
(-36)
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$803
Cost:
$900
$293 4,103 $602 66 - - $(-92) (-19) $293
4,103
kWh
$602
66
kW-months/year
-
-
MMBtu
$(-92)
(-19)
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$769
Cost:
$2,250
$769 11,137 - - - - - - $769
11,137
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$583
Cost:
$129
- - - - - - $583 96 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$583
96
MMBtu
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$443
Cost:
$174
- - - - - - $443 73 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$443
73
MMBtu
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$273
Cost:
$147
- - - - - - $273 45 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$273
45
MMBtu
TOTAL RECOMMENDED Savings:
$12,201
Cost:
$15,670
$8,669 120,750 $2,601 219 $(-102) 1 $1,033 159 $8,669
120,750
kWh
$2,601
219
kW-months/year
$(-102)
1
MMBtu
$1,033
159
MMBtu
TOTAL IMPLEMENTED Savings:
$10,576
Cost:
$13,144
$7,900 109,613 $2,601 219 $(-102) 1 $177 18 $7,900
109,613
kWh
$2,601
219
kW-months/year
$(-102)
1
MMBtu
$177
18
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2