Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1998 |
Principal Product | frozen desserts |
NAICS | n/a |
SIC | 2042 - |
Sales | $5,000,000-$10,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 25,000 |
Annual Production | 1,266,000 Units |
Production Hrs. Annual | 6,000 |
Location (State) | VT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,462 | 671,161 | kWh | $0.07 |
Electricity Demand | $24,432 | 2,202 | kW-months/year | $11.10 |
Electricity Fees | $4,899 | - | $ | - |
LPG | $22,338 | 4,241 | MMBtu | $5.27 |
TOTAL ENERGY COSTS | $97,131 | |||
RECOMMENDED SAVINGS* | $24,001 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,591 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $10,619 Cost: $30,000 |
$1,575 | 22,567 | $9,590 | 864 | $(-546) | (-96) | - | - | - | - |
$1,575 22,567 kWh |
$9,590 864 kW-months/year |
$(-546) (-96) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $6,032 Cost: - |
- | - | - | - | - | - | - | - | $6,032 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$6,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,322 Cost: $4,465 |
$827 | 11,723 | $495 | 45 | - | - | - | - | - | - |
$827 11,723 kWh |
$495 45 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,036 Cost: $600 |
- | - | - | - | $1,036 | 194 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,036 194 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $357 Cost: $240 |
$357 | 4,982 | - | - | - | - | - | - | - | - |
$357 4,982 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $225 Cost: - |
- | - | - | - | - | - | - | - | $225 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$225 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $146 Cost: - |
$146 | 2,052 | - | - | - | - | - | - | - | - |
$146 2,052 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $4,264 Cost: $9,225 |
- | - | - | - | - | - | $4,264 | 106,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,264 106,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,001 Cost: $44,530 |
$2,905 | 41,324 | $10,085 | 909 | $490 | 98 | $4,264 | 106,000 | $6,257 | - | $2,905 41,324 kWh |
$10,085 909 kW-months/year |
$490 98 MMBtu |
$4,264 106,000 lb |
$6,257 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,591 Cost: $35,305 |
$2,759 | 39,272 | $10,085 | 909 | $490 | 98 | - | - | $6,257 | - | $2,759 39,272 kWh |
$10,085 909 kW-months/year |
$490 98 MMBtu |
- - lb |
$6,257 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes |