IAC logo
IAC Assessment: ME0249
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0249
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product frozen desserts
NAICS n/a
SIC 2042 -
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 25,000
Annual Production 1,266,000 Units
Production Hrs. Annual 6,000
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,462 671,161 kWh $0.07
Electricity Demand $24,432 2,202 kW-months/year $11.10
Electricity Fees $4,899 - $ -
LPG $22,338 4,241 MMBtu $5.27
TOTAL ENERGY COSTS $97,131
RECOMMENDED SAVINGS* $24,001 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,591
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,619
Cost:
$30,000
$1,575 22,567 $9,590 864 $(-546) (-96) - - - - $1,575
22,567
kWh
$9,590
864
kW-months/year
$(-546)
(-96)
MMBtu
-
-
lb
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,032
Cost:
-
- - - - - - - - $6,032 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$6,032
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,322
Cost:
$4,465
$827 11,723 $495 45 - - - - - - $827
11,723
kWh
$495
45
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,036
Cost:
$600
- - - - $1,036 194 - - - - -
-
kWh
-
-
kW-months/year
$1,036
194
MMBtu
-
-
lb
-
-
$
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$357
Cost:
$240
$357 4,982 - - - - - - - - $357
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$225
Cost:
-
- - - - - - - - $225 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$225
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$146
Cost:
-
$146 2,052 - - - - - - - - $146
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,264
Cost:
$9,225
- - - - - - $4,264 106,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,264
106,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$24,001
Cost:
$44,530
$2,905 41,324 $10,085 909 $490 98 $4,264 106,000 $6,257 - $2,905
41,324
kWh
$10,085
909
kW-months/year
$490
98
MMBtu
$4,264
106,000
lb
$6,257
-
$
TOTAL IMPLEMENTED Savings:
$19,591
Cost:
$35,305
$2,759 39,272 $10,085 909 $490 98 - - $6,257 - $2,759
39,272
kWh
$10,085
909
kW-months/year
$490
98
MMBtu
-
-
lb
$6,257
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes