IAC logo
IAC Assessment: ME0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Poker Chips
NAICS n/a
SIC 3944 - Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales $1,000,000-$5,000,000
# of Employees 33
Plant Area (Sq.Ft.) 83,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 2,250
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,220 204,279 kWh $0.07
Electricity Demand $6,518 750 kW-months/year $8.69
Electricity Fees $1,348 - $ -
LPG $8,730 945 MMBtu $9.24
TOTAL ENERGY COSTS $31,816
RECOMMENDED SAVINGS* $6,537 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,533
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Administrative Changes Electricity Usage Electricity Demand LPG Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,554
Cost:
$4,763
$994 13,189 $560 70 - - - - $994
13,189
kWh
$560
70
kW-months/year
-
-
MMBtu
-
-
$
02: 4.8110 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$1,000
Cost:
-
- - - - - - $1,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,000
-
$
03: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$860
Cost:
-
- - - - - - $860 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$860
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$697
Cost:
$300
$672 9,672 $435 5 $(-410) (-44) - - $672
9,672
kWh
$435
5
kW-months/year
$(-410)
(-44)
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$568
Cost:
$250
$568 8,206 - - - - - - $568
8,206
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$567
Cost:
$54
$567 4,982 - - - - - - $567
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$355
Cost:
$980
$355 4,689 - - - - - - $355
4,689
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$338
Cost:
$482
$338 4,103 - - - - - - $338
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$281
Cost:
-
- - - - - - $281 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$281
-
$
10: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$186
Cost:
-
- - - - - - $186 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$186
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$82
Cost:
$100
$82 1,172 - - - - - - $82
1,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
12: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$49
Cost:
-
- - - - - - $49 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$49
-
$
TOTAL RECOMMENDED Savings:
$6,537
Cost:
$6,929
$3,576 46,013 $995 75 $(-410) (-44) $2,376 - $3,576
46,013
kWh
$995
75
kW-months/year
$(-410)
(-44)
MMBtu
$2,376
-
$
TOTAL IMPLEMENTED Savings:
$5,533
Cost:
$5,795
$2,572 35,170 $995 75 $(-410) (-44) $2,376 - $2,572
35,170
kWh
$995
75
kW-months/year
$(-410)
(-44)
MMBtu
$2,376
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG Administrative Changes Electricity Usage Electricity Demand LPG Administrative Changes