IAC logo
IAC Assessment: ME0270
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0270
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Newspapers
NAICS n/a
SIC 2711 - Newspapers
Sales $1,000,000-$5,000,000
# of Employees 90
Plant Area (Sq.Ft.) 130,000
Annual Production 1,250,000 Pieces
Production Hrs. Annual 2,500
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,691 349,355 kWh $0.06
Electricity Demand $13,306 1,540 kW-months/year $8.64
Electricity Fees $4,859 - $ -
Fuel Oil #2 $3,881 1,010 MMBtu $3.84
TOTAL ENERGY COSTS $45,467
RECOMMENDED SAVINGS* $9,191 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,830
Cost:
$13,187
$3,583 60,082 $2,247 260 - - - - - - $3,583
60,082
kWh
$2,247
260
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,661
Cost:
-
- - - - - - - - $1,661 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,661
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$654
Cost:
$200
$654 10,258 - - - - - - - - $654
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$316
Cost:
$804
- - - - $316 65 - - - - -
-
kWh
-
-
kW-months/year
$316
65
MMBtu
-
-
lb
-
-
$
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$730
Cost:
-
- - - - - - $730 41,760 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$730
41,760
lb
-
-
$
TOTAL RECOMMENDED Savings:
$9,191
Cost:
$14,191
$4,237 70,340 $2,247 260 $316 65 $730 41,760 $1,661 - $4,237
70,340
kWh
$2,247
260
kW-months/year
$316
65
MMBtu
$730
41,760
lb
$1,661
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Ancillary Material Cost