IAC Assessment: ME0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Men's shirts
NAICS n/a
SIC 2321 - Men's and Boys' Shirts, Except Work Shirts
Sales $10,000,000-$50,000,000
# of Employees 425
Plant Area (Sq.Ft.) 280,760
Annual Production 130,000 Pieces
Production Hrs. Annual 2,500
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,188 2,071,805 kWh $0.06
Electricity Demand $81,979 8,084 kW-months/year $10.14
Electricity Fees $4,419 - $ -
Fuel Oil #6 $23,016 10,353 MMBtu $2.22
TOTAL ENERGY COSTS $233,602
RECOMMENDED SAVINGS* $13,431 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 4.6310 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$6,000
Cost:
$1,500
- - - - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$6,000
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,486
Cost:
$1,468
- - - - $2,486 141 - - - - -
-
kWh
-
-
kW-months/year
$2,486
141
MMBtu
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,395
Cost:
-
- - $491 41 $1,087 62 $(-183) (-88) - - -
-
kWh
$491
41
kW-months/year
$1,087
62
MMBtu
$(-183)
(-88)
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,263
Cost:
$400
$1,263 21,102 - - - - - - - - $1,263
21,102
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,075
Cost:
-
- - - - - - - - $1,075 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,075
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$520
Cost:
$382
- - $420 24 - - $100 48 - - -
-
kWh
$420
24
kW-months/year
-
-
MMBtu
$100
48
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$419
Cost:
$300
$419 7,034 - - - - - - - - $419
7,034
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$273
Cost:
$994
$273 4,689 - - - - - - - - $273
4,689
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,431
Cost:
$5,044
$1,955 32,825 $911 65 $3,573 203 $(-83) (-40) $7,075 - $1,955
32,825
kWh
$911
65
kW-months/year
$3,573
203
MMBtu
$(-83)
(-40)
MMBtu
$7,075
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Administrative Changes