IAC logo
IAC Assessment: ME0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product plows
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 34
Plant Area (Sq.Ft.) 63,475
Annual Production 80 Pieces
Production Hrs. Annual 2,565
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,954 463,658 kWh $0.08
Electricity Demand $21,844 2,661 kW-months/year $8.21
Electricity Fees $2,083 - $ -
LPG $133 8 MMBtu $16.63
Fuel Oil #2 $15,539 4,254 MMBtu $3.65
TOTAL ENERGY COSTS $74,553
RECOMMENDED SAVINGS* $24,887 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,105
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand LPG Fuel Oil #2 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$7,431
Cost:
$1,766
- - - - - - $7,431 1,561 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,431
1,561
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,530
Cost:
$17,411
$4,186 55,686 $2,344 267 - - - - - - $4,186
55,686
kWh
$2,344
267
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,209
Cost:
$8,532
$2,728 36,342 $2,065 236 - - $(-584) (-165) - - $2,728
36,342
kWh
$2,065
236
kW-months/year
-
-
MMBtu
$(-584)
(-165)
MMBtu
-
-
$
04: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$2,640
Cost:
$5,225
- - - - - - - - $2,640 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$2,640
-
$
05: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$1,375
Cost:
$2,000
- - - - - - - - $1,375 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,375
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$917
Cost:
$150
$917 12,309 - - - - - - - - $917
12,309
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$711
Cost:
-
- - - - - - - - $711 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$711
-
$
08: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$516
Cost:
$300
$(-121) (-1,758) $(-21) (-2) - - - - $658 - $(-121)
(-1,758)
kWh
$(-21)
(-2)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$658
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$558
Cost:
$826
$748 9,965 $472 54 $(-662) (-42) - - - - $748
9,965
kWh
$472
54
kW-months/year
$(-662)
(-42)
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,887
Cost:
$36,210
$8,458 112,544 $4,860 555 $(-662) (-42) $6,847 1,396 $5,384 - $8,458
112,544
kWh
$4,860
555
kW-months/year
$(-662)
(-42)
MMBtu
$6,847
1,396
MMBtu
$5,384
-
$
TOTAL IMPLEMENTED Savings:
$16,105
Cost:
$19,627
$4,982 66,237 $2,323 265 - - $7,431 1,561 $1,369 - $4,982
66,237
kWh
$2,323
265
kW-months/year
-
-
MMBtu
$7,431
1,561
MMBtu
$1,369
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand LPG Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand LPG Fuel Oil #2 Administrative Changes