IAC logo
IAC Assessment: ME0280
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0280
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Vinyl Windows
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $50,000,000-$100,000,000
# of Employees 425
Plant Area (Sq.Ft.) 100,000
Annual Production 350,000 Pieces
Production Hrs. Annual 4,250
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,230 2,847,890 kWh $0.09
Electricity Demand $64,512 8,411 kW-months/year $7.67
Natural Gas $38,250 7,436 MMBtu $5.14
LPG $11,782 689 MMBtu $17.10
TOTAL ENERGY COSTS $370,774
RECOMMENDED SAVINGS* $445,216 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $434,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$243,000
Cost:
$20,108
- - - - - - - - $243,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$243,000
-
$
-
-
$
02: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$105,600
Cost:
$6,000
- - - - - - - - $105,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$105,600
-
$
-
-
$
03: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$15,000
Cost:
-
- - - - - - - - $15,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$15,000
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,958
Cost:
$28,528
$10,758 95,252 $200 26 - - - - - - - - $10,758
95,252
kWh
$200
26
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,204
Cost:
$1,000
$9,204 102,286 - - - - - - - - - - $9,204
102,286
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$3,402
Cost:
$4,940
$3,402 37,808 - - - - - - - - - - $3,402
37,808
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,619
Cost:
$1,000
$1,619 18,171 - - - - - - - - - - $1,619
18,171
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$1,092
Cost:
$1,240
- - - - $1,092 215 - - - - - - -
-
kWh
-
-
kW-months/year
$1,092
215
MMBtu
-
-
lb
-
-
$
-
-
$
09: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$55,341
Cost:
$30,500
- - - - - - $15,341 - - - $40,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,341
-
lb
-
-
$
$40,000
-
$
TOTAL RECOMMENDED Savings:
$445,216
Cost:
$93,316
$24,983 253,517 $200 26 $1,092 215 $15,341 - $363,600 - $40,000 - $24,983
253,517
kWh
$200
26
kW-months/year
$1,092
215
MMBtu
$15,341
-
lb
$363,600
-
$
$40,000
-
$
TOTAL IMPLEMENTED Savings:
$434,393
Cost:
$91,316
$14,160 133,060 $200 26 $1,092 215 $15,341 - $363,600 - $40,000 - $14,160
133,060
kWh
$200
26
kW-months/year
$1,092
215
MMBtu
$15,341
-
lb
$363,600
-
$
$40,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product