Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | NC Turning and Milling Equipment |
NAICS | n/a |
SIC | 3541 - Machine Tools, Metal Cutting Types |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 92,000 |
Annual Production | 4,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $281,019 | 3,817,702 | kWh | $0.07 |
Electricity Demand | $67,482 | 6,674 | kW-months/year | $10.11 |
Electricity Fees | $3,850 | - | $ | - |
LPG | $12,510 | 1,536 | MMBtu | $8.14 |
Fuel Oil #2 | $3,022 | 671 | MMBtu | $4.50 |
TOTAL ENERGY COSTS | $372,264 | |||
RECOMMENDED SAVINGS* | $122,437 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $85,190 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (haz) | Water Consumption | Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $30,872 Cost: $44,461 |
$25,064 | 358,148 | $5,808 | 570 | - | - | - | - | - | - | - | - |
$25,064 358,148 kWh |
$5,808 570 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,085 Cost: $3,826 |
$4,635 | 66,237 | $2,756 | 270 | $(-2,306) | (-57) | - | - | - | - | - | - |
$4,635 66,237 kWh |
$2,756 270 kW-months/year |
$(-2,306) (-57) MMBtu |
- - Tgal |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,461 Cost: $50 |
$2,461 | 35,170 | - | - | - | - | - | - | - | - | - | - |
$2,461 35,170 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,277 Cost: $300 |
$2,277 | 32,239 | - | - | - | - | - | - | - | - | - | - |
$2,277 32,239 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID |
Savings: $80,452 Cost: $92,000 |
- | - | - | - | - | - | - | - | $80,452 | 1,750 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$80,452 1,750 gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,290 Cost: $105 |
$973 | 14,068 | - | - | - | - | $144 | 87,500 | - | - | $173 | - |
$973 14,068 kWh |
- - kW-months/year |
- - MMBtu |
$144 87,500 Tgal |
- - gal |
$173 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $122,437 Cost: $140,742 |
$35,410 | 505,862 | $8,564 | 840 | $(-2,306) | (-57) | $144 | 87,500 | $80,452 | 1,750 | $173 | - | $35,410 505,862 kWh |
$8,564 840 kW-months/year |
$(-2,306) (-57) MMBtu |
$144 87,500 Tgal |
$80,452 1,750 gal |
$173 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $85,190 Cost: $92,350 |
$4,738 | 67,409 | - | - | - | - | - | - | $80,452 | 1,750 | - | - | $4,738 67,409 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$80,452 1,750 gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (haz) | Water Consumption | Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (haz) | Water Consumption |