IAC Assessment: ME0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product NC Turning and Milling Equipment
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 92,000
Annual Production 4,000 Pieces
Production Hrs. Annual 8,760
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,019 3,817,702 kWh $0.07
Electricity Demand $67,482 6,674 kW-months/year $10.11
Electricity Fees $3,850 - $ -
LPG $12,510 1,536 MMBtu $8.14
Fuel Oil #2 $3,022 671 MMBtu $4.50
TOTAL ENERGY COSTS $372,264
RECOMMENDED SAVINGS* $122,437 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,190
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Water Disposal Other Liquid (haz) Water Consumption Electricity Usage Electricity Demand LPG Water Disposal Other Liquid (haz) Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,872
Cost:
$44,461
$25,064 358,148 $5,808 570 - - - - - - - - $25,064
358,148
kWh
$5,808
570
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,085
Cost:
$3,826
$4,635 66,237 $2,756 270 $(-2,306) (-57) - - - - - - $4,635
66,237
kWh
$2,756
270
kW-months/year
$(-2,306)
(-57)
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,461
Cost:
$50
$2,461 35,170 - - - - - - - - - - $2,461
35,170
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,277
Cost:
$300
$2,277 32,239 - - - - - - - - - - $2,277
32,239
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
05: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$80,452
Cost:
$92,000
- - - - - - - - $80,452 1,750 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$80,452
1,750
gal
-
-
Tgal
06: 3.4151 MINIMIZE WATER USAGE Savings:
$1,290
Cost:
$105
$973 14,068 - - - - $144 87,500 - - $173 - $973
14,068
kWh
-
-
kW-months/year
-
-
MMBtu
$144
87,500
Tgal
-
-
gal
$173
-
Tgal
TOTAL RECOMMENDED Savings:
$122,437
Cost:
$140,742
$35,410 505,862 $8,564 840 $(-2,306) (-57) $144 87,500 $80,452 1,750 $173 - $35,410
505,862
kWh
$8,564
840
kW-months/year
$(-2,306)
(-57)
MMBtu
$144
87,500
Tgal
$80,452
1,750
gal
$173
-
Tgal
TOTAL IMPLEMENTED Savings:
$85,190
Cost:
$92,350
$4,738 67,409 - - - - - - $80,452 1,750 - - $4,738
67,409
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$80,452
1,750
gal
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ Tgal
Electricity Usage Electricity Demand LPG Water Disposal Other Liquid (haz) Water Consumption Electricity Usage Electricity Demand LPG Water Disposal Other Liquid (haz) Water Consumption