IAC logo
IAC Assessment: ME0282
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0282
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Fiber Extrusion
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 83
Plant Area (Sq.Ft.) 45,000
Annual Production 20,500,000 Pounds
Production Hrs. Annual 8,400
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $855,458 9,936,987 kWh $0.09
Electricity Demand $236,287 31,547 kW-months/year $7.49
LPG $139,448 27,975 MMBtu $4.98
TOTAL ENERGY COSTS $1,248,193
RECOMMENDED SAVINGS* $101,097 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,156
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Water Disposal Electricity Usage Electricity Demand LPG Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$80,666
Cost:
$36,000
$97,580 1,394,490 $14,740 1,968 $(-31,654) (-6,344) - - $97,580
1,394,490
kWh
$14,740
1,968
kW-months/year
$(-31,654)
(-6,344)
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,760
Cost:
$8,904
$3,088 44,256 $672 90 - - - - $3,088
44,256
kWh
$672
90
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,228
Cost:
$250
$2,228 31,946 - - - - - - $2,228
31,946
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$2,181
Cost:
$4,360
$2,181 31,067 - - - - - - $2,181
31,067
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4151 MINIMIZE WATER USAGE Savings:
$12,262
Cost:
$1,000
- - - - - - $12,262 36,967 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,262
36,967
Tgal
TOTAL RECOMMENDED Savings:
$101,097
Cost:
$50,514
$105,077 1,501,759 $15,412 2,058 $(-31,654) (-6,344) $12,262 36,967 $105,077
1,501,759
kWh
$15,412
2,058
kW-months/year
$(-31,654)
(-6,344)
MMBtu
$12,262
36,967
Tgal
TOTAL IMPLEMENTED Savings:
$95,156
Cost:
$37,250
$99,808 1,426,436 $14,740 1,968 $(-31,654) (-6,344) $12,262 36,967 $99,808
1,426,436
kWh
$14,740
1,968
kW-months/year
$(-31,654)
(-6,344)
MMBtu
$12,262
36,967
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand LPG Water Disposal Electricity Usage Electricity Demand LPG Water Disposal