Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | Wooden Dowels |
NAICS | n/a |
SIC | 2499 - Wood Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 2,250 Units |
Production Hrs. Annual | 4,250 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $276,012 | 3,053,634 | kWh | $0.09 |
Fuel Oil #2 | $6,764 | 1,431 | MMBtu | $4.73 |
Wood | $3,393 | 4,931 | MMBtu | $0.69 |
TOTAL ENERGY COSTS | $286,169 | |||
RECOMMENDED SAVINGS* | $12,247 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,243 |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Personnel Changes | Water Consumption | Electricity Usage | Wood | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,698 Cost: $16,582 |
$5,698 | 54,807 | - | - | - | - | - | - |
$5,698 54,807 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.221 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY |
Savings: $3,500 Cost: - |
- | - | - | - | $3,500 | - | - | - |
- - kWh |
- - MMBtu |
$3,500 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,844 Cost: $300 |
$1,844 | 30,481 | - | - | - | - | - | - |
$1,844 30,481 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $706 Cost: $1,772 |
- | - | $706 | 613 | - | - | - | - |
- - kWh |
$706 613 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $339 Cost: $600 |
- | - | $339 | 294 | - | - | - | - |
- - kWh |
$339 294 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $160 Cost: - |
- | - | - | - | - | - | $160 | - |
- - kWh |
- - MMBtu |
- - $ |
$160 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,247 Cost: $19,254 |
$7,542 | 85,288 | $1,045 | 907 | $3,500 | - | $160 | - | $7,542 85,288 kWh |
$1,045 907 MMBtu |
$3,500 - $ |
$160 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,243 Cost: $18,954 |
$5,698 | 54,807 | $1,045 | 907 | $3,500 | - | - | - | $5,698 54,807 kWh |
$1,045 907 MMBtu |
$3,500 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Wood | Personnel Changes | Water Consumption | Electricity Usage | Wood | Personnel Changes | Water Consumption |