IAC logo
IAC Assessment: ME0293
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0293
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Asphalt Hot-mix & Crushed Stone
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 170,000 Tons
Production Hrs. Annual 2,484
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,414 2,587,046 kWh $0.09
Electricity Demand $56,990 9,905 kW-months/year $5.75
Electricity Fees $4,001 - $ -
Fuel Oil #2 $26,721 6,114 MMBtu $4.37
Other Energy $120,140 49,765 MMBtu $2.41
TOTAL ENERGY COSTS $447,266
RECOMMENDED SAVINGS* $72,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,445
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Energy Increase in Production Electricity Usage Electricity Demand Electricity Fees Other Energy Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ %
01: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$19,379
Cost:
$38,000
$15,009 169,402 $4,370 761 - - - - - - $15,009
169,402
kWh
$4,370
761
kW-months/year
-
-
$
-
-
MMBtu
-
-
%
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,138
Cost:
$10,890
$15,138 155,334 - - - - - - - - $15,138
155,334
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
%
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,661
Cost:
$7,900
- - - - - - $4,661 1,975 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,661
1,975
MMBtu
-
-
%
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,183
Cost:
-
- - $2,143 - $40 - - - - - -
-
kWh
$2,143
-
kW-months/year
$40
-
$
-
-
MMBtu
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$262
Cost:
$200
$201 2,052 $61 11 - - - - - - $201
2,052
kWh
$61
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
%
06: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$30,516
Cost:
$15,070
- - - - - - - (-1,709) $30,516 - -
-
kWh
-
-
kW-months/year
-
-
$
-
(-1,709)
MMBtu
$30,516
-
%
TOTAL RECOMMENDED Savings:
$72,139
Cost:
$72,060
$30,348 326,788 $6,574 772 $40 - $4,661 266 $30,516 - $30,348
326,788
kWh
$6,574
772
kW-months/year
$40
-
$
$4,661
266
MMBtu
$30,516
-
%
TOTAL IMPLEMENTED Savings:
$2,445
Cost:
$200
$201 2,052 $2,204 11 $40 - - - - - $201
2,052
kWh
$2,204
11
kW-months/year
$40
-
$
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ %
Electricity Usage Electricity Demand Electricity Fees Other Energy Increase in Production Electricity Usage Electricity Demand Electricity Fees Other Energy Increase in Production