Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | Asphalt Hot-mix & Crushed Stone |
NAICS | n/a |
SIC | 2951 - Asphalt Paving Mixtures And Blocks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 170,000 Tons |
Production Hrs. Annual | 2,484 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $239,414 | 2,587,046 | kWh | $0.09 |
Electricity Demand | $56,990 | 9,905 | kW-months/year | $5.75 |
Electricity Fees | $4,001 | - | $ | - |
Fuel Oil #2 | $26,721 | 6,114 | MMBtu | $4.37 |
Other Energy | $120,140 | 49,765 | MMBtu | $2.41 |
TOTAL ENERGY COSTS | $447,266 | |||
RECOMMENDED SAVINGS* | $72,139 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,445 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Other Energy | Increase in Production | Electricity Usage | Electricity Demand | Electricity Fees | Other Energy | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH |
Savings: $19,379 Cost: $38,000 |
$15,009 | 169,402 | $4,370 | 761 | - | - | - | - | - | - |
$15,009 169,402 kWh |
$4,370 761 kW-months/year |
- - $ |
- - MMBtu |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $15,138 Cost: $10,890 |
$15,138 | 155,334 | - | - | - | - | - | - | - | - |
$15,138 155,334 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,661 Cost: $7,900 |
- | - | - | - | - | - | $4,661 | 1,975 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$4,661 1,975 MMBtu |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $2,183 Cost: - |
- | - | $2,143 | - | $40 | - | - | - | - | - |
- - kWh |
$2,143 - kW-months/year |
$40 - $ |
- - MMBtu |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $262 Cost: $200 |
$201 | 2,052 | $61 | 11 | - | - | - | - | - | - |
$201 2,052 kWh |
$61 11 kW-months/year |
- - $ |
- - MMBtu |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $30,516 Cost: $15,070 |
- | - | - | - | - | - | - | (-1,709) | $30,516 | - |
- - kWh |
- - kW-months/year |
- - $ |
- (-1,709) MMBtu |
$30,516 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,139 Cost: $72,060 |
$30,348 | 326,788 | $6,574 | 772 | $40 | - | $4,661 | 266 | $30,516 | - | $30,348 326,788 kWh |
$6,574 772 kW-months/year |
$40 - $ |
$4,661 266 MMBtu |
$30,516 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,445 Cost: $200 |
$201 | 2,052 | $2,204 | 11 | $40 | - | - | - | - | - | $201 2,052 kWh |
$2,204 11 kW-months/year |
$40 - $ |
- - MMBtu |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Other Energy | Increase in Production | Electricity Usage | Electricity Demand | Electricity Fees | Other Energy | Increase in Production |