IAC logo
IAC Assessment: ME0300
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0300
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Adhesives
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 114
Plant Area (Sq.Ft.) 106,000
Annual Production 6,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,685 3,588,218 kWh $0.05
Electricity Demand $64,174 7,895 kW-months/year $8.13
Electricity Fees $(-1,252) - $ -
Natural Gas $130,904 19,772 MMBtu $6.62
TOTAL ENERGY COSTS $375,511
RECOMMENDED SAVINGS* $58,141 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7314 REDUCE VENTILATION AIR Savings:
$42,906
Cost:
$66,000
$15,647 309,203 - - $27,259 3,500 - - $15,647
309,203
kWh
-
-
kW-months/year
$27,259
3,500
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,547
Cost:
$13,428
$4,086 80,891 $2,461 303 - - - - $4,086
80,891
kWh
$2,461
303
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$765
Cost:
$850
$765 15,240 - - - - - - $765
15,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,323
Cost:
$3,625
$2,669 12,309 - - $(-346) (-52) - - $2,669
12,309
kWh
-
-
kW-months/year
$(-346)
(-52)
MMBtu
-
-
$
05: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$5,600
Cost:
$9,000
- - - - - - $5,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,600
-
$
TOTAL RECOMMENDED Savings:
$58,141
Cost:
$92,903
$23,167 417,643 $2,461 303 $26,913 3,448 $5,600 - $23,167
417,643
kWh
$2,461
303
kW-months/year
$26,913
3,448
MMBtu
$5,600
-
$
TOTAL IMPLEMENTED Savings:
$5,600
Cost:
$9,000
- - - - - - $5,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes