Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | Adhesives |
NAICS | n/a |
SIC | 2851 - Paints And Allied Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 114 |
Plant Area (Sq.Ft.) | 106,000 |
Annual Production | 6,500,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $181,685 | 3,588,218 | kWh | $0.05 |
Electricity Demand | $64,174 | 7,895 | kW-months/year | $8.13 |
Electricity Fees | $(-1,252) | - | $ | - |
Natural Gas | $130,904 | 19,772 | MMBtu | $6.62 |
TOTAL ENERGY COSTS | $375,511 | |||
RECOMMENDED SAVINGS* | $58,141 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,600 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $42,906 Cost: $66,000 |
$15,647 | 309,203 | - | - | $27,259 | 3,500 | - | - |
$15,647 309,203 kWh |
- - kW-months/year |
$27,259 3,500 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,547 Cost: $13,428 |
$4,086 | 80,891 | $2,461 | 303 | - | - | - | - |
$4,086 80,891 kWh |
$2,461 303 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $765 Cost: $850 |
$765 | 15,240 | - | - | - | - | - | - |
$765 15,240 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,323 Cost: $3,625 |
$2,669 | 12,309 | - | - | $(-346) | (-52) | - | - |
$2,669 12,309 kWh |
- - kW-months/year |
$(-346) (-52) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $5,600 Cost: $9,000 |
- | - | - | - | - | - | $5,600 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,141 Cost: $92,903 |
$23,167 | 417,643 | $2,461 | 303 | $26,913 | 3,448 | $5,600 | - | $23,167 417,643 kWh |
$2,461 303 kW-months/year |
$26,913 3,448 MMBtu |
$5,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,600 Cost: $9,000 |
- | - | - | - | - | - | $5,600 | - | - - kWh |
- - kW-months/year |
- - MMBtu |
$5,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |