IAC logo
IAC Assessment: ME0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Dimensional lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 56,603
Annual Production 90,000 Thousand Feet
Production Hrs. Annual 4,680
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,009,234 12,238,863 kWh $0.08
Electricity Demand $209,428 27,026 kW-months/year $7.75
Electricity Fees $1,013 - $ -
Fuel Oil #2 $17,296 3,934 MMBtu $4.40
Wood $209,785 256,403 MMBtu $0.82
TOTAL ENERGY COSTS $1,446,756
RECOMMENDED SAVINGS* $1,936,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ %
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,620
Cost:
$42,550
$46,620 564,478 - - - - - - - - - - $46,620
564,478
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
%
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,137
Cost:
$6,000
$3,848 46,600 $2,283 304 $(-994) (-199) - - - - - - $3,848
46,600
kWh
$2,283
304
kW-months/year
$(-994)
(-199)
MMBtu
-
-
MMBtu
-
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,862
Cost:
$9,010
$3,896 47,186 $966 129 - - - - - - - - $3,896
47,186
kWh
$966
129
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
%
04: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT Savings:
$879,619
Cost:
$2,084,500
$958,703 11,626,905 $43,685 27,026 - - $(-106,207) (-129,248) $(-16,562) - - - $958,703
11,626,905
kWh
$43,685
27,026
kW-months/year
-
-
MMBtu
$(-106,207)
(-129,248)
MMBtu
$(-16,562)
-
$
-
-
%
05: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$1,000,000
Cost:
-
- - - - - - - - - - $1,000,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$1,000,000
-
%
TOTAL RECOMMENDED Savings:
$1,936,238
Cost:
$2,142,060
$1,013,067 12,285,169 $46,934 27,459 $(-994) (-199) $(-106,207) (-129,248) $(-16,562) - $1,000,000 - $1,013,067
12,285,169
kWh
$46,934
27,459
kW-months/year
$(-994)
(-199)
MMBtu
$(-106,207)
(-129,248)
MMBtu
$(-16,562)
-
$
$1,000,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes Increase in Production