IAC logo
IAC Assessment: ME0304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Beer
NAICS n/a
SIC 2082 - Malt Beverages
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 15,000
Annual Production 15,000 BBL
Production Hrs. Annual 3,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,082 213,951 kWh $0.08
Electricity Demand $6,657 767 kW-months/year $8.68
Electricity Fees $896 - $ -
Natural Gas $9,934 1,509 MMBtu $6.58
TOTAL ENERGY COSTS $39,358
RECOMMENDED SAVINGS* $34,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,683
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,601
Cost:
$3,600
$1,083 14,361 $781 90 $(-263) (-61) - - - - - - $1,083
14,361
kWh
$781
90
kW-months/year
$(-263)
(-61)
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,300
Cost:
$3,542
$1,146 15,240 $154 18 - - - - - - - - $1,146
15,240
kWh
$154
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$152
Cost:
$384
- - - - $152 19 - - - - - - -
-
kWh
-
-
kW-months/year
$152
19
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$1,848
Cost:
-
$(-232) (-3,517) - - - - $1,495 280,819 - - $585 - $(-232)
(-3,517)
kWh
-
-
kW-months/year
-
-
MMBtu
$1,495
280,819
Tgal
-
-
$
$585
-
Tgal
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$29,835
Cost:
$4,434
$(-113) (-1,465) $(-52) (-6) - - - - $30,000 - - - $(-113)
(-1,465)
kWh
$(-52)
(-6)
kW-months/year
-
-
MMBtu
-
-
Tgal
$30,000
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$34,736
Cost:
$11,960
$1,884 24,619 $883 102 $(-111) (-42) $1,495 280,819 $30,000 - $585 - $1,884
24,619
kWh
$883
102
kW-months/year
$(-111)
(-42)
MMBtu
$1,495
280,819
Tgal
$30,000
-
$
$585
-
Tgal
TOTAL IMPLEMENTED Savings:
$31,683
Cost:
$4,434
$(-345) (-4,982) $(-52) (-6) - - $1,495 280,819 $30,000 - $585 - $(-345)
(-4,982)
kWh
$(-52)
(-6)
kW-months/year
-
-
MMBtu
$1,495
280,819
Tgal
$30,000
-
$
$585
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption