IAC logo
IAC Assessment: ME0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Tools & tool handles
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 37,044
Annual Production 1,250 Thousand Feet
Production Hrs. Annual 2,300
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,494 820,633 kWh $0.09
Electricity Demand $24,480 4,121 kW-months/year $5.94
Electricity Fees $2,752 - $ -
LPG $8,101 870 MMBtu $9.31
Fuel Oil #1 $6,529 782 MMBtu $8.35
Fuel Oil #2 $1,898 258 MMBtu $7.36
Other Energy $2,948 262 MMBtu $11.25
TOTAL ENERGY COSTS $122,202
RECOMMENDED SAVINGS* $18,287 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Water Consumption Increase in Production Electricity Usage Electricity Demand Fuel Oil #1 Water Consumption Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,013
Cost:
$340
$2,013 21,981 - - - - - - - - $2,013
21,981
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$396
Cost:
$1,193
$321 3,517 $75 13 - - - - - - $321
3,517
kWh
$75
13
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$366
Cost:
$357
- - - - $366 35 - - - - -
-
kWh
-
-
kW-months/year
$366
35
MMBtu
-
-
Tgal
-
-
%
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$187
Cost:
$350
$187 2,052 - - - - - - - - $187
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
05: 3.4151 MINIMIZE WATER USAGE Savings:
$325
Cost:
$225
- - - - - - $325 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$325
-
Tgal
-
-
%
06: 4.446 AUTOMATE FINISHING PROCESS Savings:
$15,000
Cost:
$41,800
- - - - - - - - $15,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$15,000
-
%
TOTAL RECOMMENDED Savings:
$18,287
Cost:
$44,265
$2,521 27,550 $75 13 $366 35 $325 - $15,000 - $2,521
27,550
kWh
$75
13
kW-months/year
$366
35
MMBtu
$325
-
Tgal
$15,000
-
%
TOTAL IMPLEMENTED Savings:
$18,100
Cost:
$43,915
$2,334 25,498 $75 13 $366 35 $325 - $15,000 - $2,334
25,498
kWh
$75
13
kW-months/year
$366
35
MMBtu
$325
-
Tgal
$15,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ %
Electricity Usage Electricity Demand Fuel Oil #1 Water Consumption Increase in Production Electricity Usage Electricity Demand Fuel Oil #1 Water Consumption Increase in Production