IAC logo
IAC Assessment: MI0016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2001
Principal Product Construction castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 264,915
Annual Production 0 Units
Production Hrs. Annual 4,992
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $585,112 10,835,415 kWh $0.05
Electricity Demand $191,456 23,578 kW-months/year $8.12
Natural Gas $242,840 28,425 MMBtu $8.54
TOTAL ENERGY COSTS $1,036,467
RECOMMENDED SAVINGS* $211,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,381
#|Description Savings
Cost
Status Electricity Usage Water Disposal Administrative Changes Water Consumption Primary Product Electricity Usage Water Disposal Administrative Changes Water Consumption Primary Product
$ kWh $ Tgal $ $ $ Tgal $ $
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$7,181
Cost:
$3,300
- - - - - - - - $7,181 - -
-
kWh
-
-
Tgal
-
-
$
-
-
Tgal
$7,181
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$70,200
Cost:
$187
$70,200 2,340,000 - - - - - - - - $70,200
2,340,000
kWh
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
03: 3.4155 METER WASTE WATER Savings:
$8,529
Cost:
$3,650
- - $8,529 1,413,150 - - - - - - -
-
kWh
$8,529
1,413,150
Tgal
-
-
$
-
-
Tgal
-
-
$
04: 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL Savings:
$21,440
Cost:
$10,399
$21,440 731,231 - - - - - - - - $21,440
731,231
kWh
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$6,397
Cost:
$1,899
- - - - - - $6,397 - - - -
-
kWh
-
-
Tgal
-
-
$
$6,397
-
Tgal
-
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$97,899
Cost:
$585,000
- - - - $97,899 - - - - - -
-
kWh
-
-
Tgal
$97,899
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$211,646
Cost:
$604,435
$91,640 3,071,231 $8,529 1,413,150 $97,899 - $6,397 - $7,181 - $91,640
3,071,231
kWh
$8,529
1,413,150
Tgal
$97,899
-
$
$6,397
-
Tgal
$7,181
-
$
TOTAL IMPLEMENTED Savings:
$77,381
Cost:
$3,487
$70,200 2,340,000 - - - - - - $7,181 - $70,200
2,340,000
kWh
-
-
Tgal
-
-
$
-
-
Tgal
$7,181
-
$
Savings
Cost
$ kWh $ Tgal $ $ $ Tgal $ $
Electricity Usage Water Disposal Administrative Changes Water Consumption Primary Product Electricity Usage Water Disposal Administrative Changes Water Consumption Primary Product