IAC logo
IAC Assessment: MI0037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2002
Principal Product Rethreading Aircraft Tires
NAICS n/a
SIC 7534 - Tire Retreading And Repair Shops
Sales $1,000,000-$5,000,000
# of Employees 65
Plant Area (Sq.Ft.) 47,000
Annual Production 50,000 Pieces
Production Hrs. Annual 5,460
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,935 1,991,040 kWh $0.06
Electricity Demand $36,349 4,602 kW-months/year $7.90
Natural Gas $115,418 57,706 MMBtu $2.00
LPG $7,043 4,063 MMBtu $1.73
TOTAL ENERGY COSTS $284,745
RECOMMENDED SAVINGS* $73,783 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,174
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$31,994
Cost:
$1
$31,994 505,440 - - $31,994
505,440
kWh
-
-
kW-months/year
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$12,400
Cost:
$24,000
$12,400 175,800 - - $12,400
175,800
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,361
Cost:
$120
$7,134 140,582 $227 28 $7,134
140,582
kWh
$227
28
kW-months/year
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$12,505
Cost:
$1,250
$10,032 158,496 $2,473 305 $10,032
158,496
kWh
$2,473
305
kW-months/year
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,419
Cost:
$250
$2,419 38,220 - - $2,419
38,220
kWh
-
-
kW-months/year
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$7,104
Cost:
$3,545
- - $7,104 876 -
-
kWh
$7,104
876
kW-months/year
TOTAL RECOMMENDED Savings:
$73,783
Cost:
$29,166
$63,979 1,018,538 $9,804 1,209 $63,979
1,018,538
kWh
$9,804
1,209
kW-months/year
TOTAL IMPLEMENTED Savings:
$54,174
Cost:
$24,371
$53,947 860,042 $227 28 $53,947
860,042
kWh
$227
28
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand