IAC logo
IAC Assessment: MI0045
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0045
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2002
Principal Product Pharmaceutical
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $1,000,000-$5,000,000
# of Employees 56
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,295
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,774 1,165,855 kWh $0.06
Electricity Demand $22,384 3,090 kW-months/year $7.24
TOTAL ENERGY COSTS $96,158
RECOMMENDED SAVINGS* $348,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $342,094
#|Description Savings
Cost
Status Electricity Usage One-time Revenue or Avoided Cost Primary Product Electricity Usage One-time Revenue or Avoided Cost Primary Product
$ kWh $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$315,000
Cost:
$75,000
- - $315,000 - - - -
-
kWh
$315,000
-
$
-
-
$
02: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$20,280
Cost:
$650
- - - - $20,280 - -
-
kWh
-
-
$
$20,280
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,814
Cost:
$5,700
$6,814 113,568 - - - - $6,814
113,568
kWh
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,500
Cost:
$7
$3,500 58,320 - - - - $3,500
58,320
kWh
-
-
$
-
-
$
05: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$2,961
Cost:
$1,550
$2,961 49,341 - - - - $2,961
49,341
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$348,555
Cost:
$82,907
$13,275 221,229 $315,000 - $20,280 - $13,275
221,229
kWh
$315,000
-
$
$20,280
-
$
TOTAL IMPLEMENTED Savings:
$342,094
Cost:
$81,350
$6,814 113,568 $315,000 - $20,280 - $6,814
113,568
kWh
$315,000
-
$
$20,280
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage One-time Revenue or Avoided Cost Primary Product Electricity Usage One-time Revenue or Avoided Cost Primary Product