IAC logo
IAC Assessment: MI0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2002
Principal Product Semiconductor diodes and rectifiers
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 40,000
Annual Production 0 Units
Production Hrs. Annual 2,340
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,257 1,788,994 kWh $0.12
LPG $33,641 44,530 MMBtu $0.76
TOTAL ENERGY COSTS $246,898
RECOMMENDED SAVINGS* $337,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Primary Product Electricity Usage Primary Product
$ kWh $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$173,081
Cost:
$82,800
- - $173,081 - -
-
kWh
$173,081
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$95,397
Cost:
$66,000
$95,397 1,589,952 - - $95,397
1,589,952
kWh
-
-
$
03: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$53,360
Cost:
$5,000
$53,360 889,325 - - $53,360
889,325
kWh
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$10,046
Cost:
$21,150
$10,046 167,440 - - $10,046
167,440
kWh
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,880
Cost:
$2
$2,880 48,001 - - $2,880
48,001
kWh
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,860
Cost:
$1,338
$2,860 47,669 - - $2,860
47,669
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$337,624
Cost:
$176,290
$164,543 2,742,387 $173,081 - $164,543
2,742,387
kWh
$173,081
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Primary Product Electricity Usage Primary Product