IAC logo
IAC Assessment: MI0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Lumber, pre-fabricated roof truss, fabricated rebar’s
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 522,720
Annual Production 100,000 Pieces
Production Hrs. Annual 3,000
Location (State) Fl
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,940 1,158,900 kWh $0.05
Electricity Demand $26,504 3,608 kW-months/year $7.35
Electricity Fees $16,878 - $ -
TOTAL ENERGY COSTS $102,322
RECOMMENDED SAVINGS* $231,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $230,698
#|Description Savings
Cost
Status Electricity Usage Primary Product Electricity Usage Primary Product
$ kWh $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$21,868
Cost:
$2,300
$21,868 368,341 - - $21,868
368,341
kWh
-
-
$
02: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$197,433
Cost:
$74,805
$570 9,763 $196,863 - $570
9,763
kWh
$196,863
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$175
Cost:
-
$175 3,513 - - $175
3,513
kWh
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$11,397
Cost:
$5,248
$847 16,092 $10,550 - $847
16,092
kWh
$10,550
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,027
Cost:
-
$1,027 19,241 - - $1,027
19,241
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$231,900
Cost:
$82,353
$24,487 416,950 $207,413 - $24,487
416,950
kWh
$207,413
-
$
TOTAL IMPLEMENTED Savings:
$230,698
Cost:
$82,353
$23,285 394,196 $207,413 - $23,285
394,196
kWh
$207,413
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Primary Product Electricity Usage Primary Product