Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2004 |
Principal Product | Industrial injection molded plastic products |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 520,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $503,368 | 10,670,400 | kWh | $0.05 |
Electricity Demand | $173,010 | 21,208 | kW-months/year | $8.16 |
Electricity Fees | $73,723 | - | $ | - |
TOTAL ENERGY COSTS | $750,101 | |||
RECOMMENDED SAVINGS* | $57,680 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Personnel Changes | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $18,276 Cost: $600 |
- | - | - | - | $18,276 | - | - | - |
- - kWh |
- - $ |
$18,276 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,092 Cost: $3,064 |
$1,092 | 16,970 | - | - | - | - | - | - |
$1,092 16,970 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,977 Cost: $1,982 |
$1,993 | 55,776 | - | - | - | - | $9,984 | - |
$1,993 55,776 kWh |
- - $ |
- - $ |
$9,984 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $21,570 Cost: $30,000 |
- | - | - | - | - | - | $21,570 | - |
- - kWh |
- - $ |
- - $ |
$21,570 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,291 Cost: $360 |
$2,291 | 48,840 | - | - | - | - | - | - |
$2,291 48,840 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,474 Cost: $590 |
$4,554 | 91,760 | $(-2,080) | - | - | - | - | - |
$4,554 91,760 kWh |
$(-2,080) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,680 Cost: $36,596 |
$9,930 | 213,346 | $(-2,080) | - | $18,276 | - | $31,554 | - | $9,930 213,346 kWh |
$(-2,080) - $ |
$18,276 - $ |
$31,554 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Personnel Changes | Administrative Changes | Primary Product |