IAC logo
IAC Assessment: MI0081
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0081
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Industrial injection molded plastic products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 105,000
Annual Production 520,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $503,368 10,670,400 kWh $0.05
Electricity Demand $173,010 21,208 kW-months/year $8.16
Electricity Fees $73,723 - $ -
TOTAL ENERGY COSTS $750,101
RECOMMENDED SAVINGS* $57,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Primary Product Electricity Usage Personnel Changes Administrative Changes Primary Product
$ kWh $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,276
Cost:
$600
- - - - $18,276 - - - -
-
kWh
-
-
$
$18,276
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,092
Cost:
$3,064
$1,092 16,970 - - - - - - $1,092
16,970
kWh
-
-
$
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,977
Cost:
$1,982
$1,993 55,776 - - - - $9,984 - $1,993
55,776
kWh
-
-
$
-
-
$
$9,984
-
$
04: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$21,570
Cost:
$30,000
- - - - - - $21,570 - -
-
kWh
-
-
$
-
-
$
$21,570
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,291
Cost:
$360
$2,291 48,840 - - - - - - $2,291
48,840
kWh
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,474
Cost:
$590
$4,554 91,760 $(-2,080) - - - - - $4,554
91,760
kWh
$(-2,080)
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$57,680
Cost:
$36,596
$9,930 213,346 $(-2,080) - $18,276 - $31,554 - $9,930
213,346
kWh
$(-2,080)
-
$
$18,276
-
$
$31,554
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Primary Product Electricity Usage Personnel Changes Administrative Changes Primary Product