IAC Assessment: MI0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Acoustic panels
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 137,800
Annual Production 4,000 Pieces
Production Hrs. Annual 1,700
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,301 2,016,360 kWh $0.05
Electricity Demand $54,099 6,632 kW-months/year $8.16
Electricity Fees $18,262 - $ -
TOTAL ENERGY COSTS $166,662
RECOMMENDED SAVINGS* $91,692 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,667
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,443
Cost:
$96,600
- - - - $10,443 - -
-
kWh
-
-
$
$10,443
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$10,385
Cost:
$2,300
$10,385 187,313 - - - - $10,385
187,313
kWh
-
-
$
-
-
$
03: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$47,434
Cost:
$41,672
$(-1,783) (-35,847) $49,217 - - - $(-1,783)
(-35,847)
kWh
$49,217
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,282
Cost:
$2,670
$4,282 86,009 - - - - $4,282
86,009
kWh
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,313
Cost:
$13,803
$8,313 166,994 - - - - $8,313
166,994
kWh
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,241
Cost:
$610
$1,241 24,997 - - - - $1,241
24,997
kWh
-
-
$
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,594
Cost:
$40
- - - - $9,594 - -
-
kWh
-
-
$
$9,594
-
$
TOTAL RECOMMENDED Savings:
$91,692
Cost:
$157,695
$22,438 429,466 $49,217 - $20,037 - $22,438
429,466
kWh
$49,217
-
$
$20,037
-
$
TOTAL IMPLEMENTED Savings:
$14,667
Cost:
$4,970
$14,667 273,322 - - - - $14,667
273,322
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes