Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Sports fishing boat
NAICS 336612 - Boat Building
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 385,000
Annual Production 70 Pieces
Production Hrs. Annual 3,099
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $156,285 3,065,500 kWh $0.05
Electricity Demand $85,231 10,925 kW-months/year $7.80
Electricity Fees $49,884 - $ -
TOTAL ENERGY COSTS $291,400
RECOMMENDED SAVINGS* $91,324 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,143
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$13,096
Cost:
$600
- - - - $13,096 - -
-
kWh
-
-
$
$13,096
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$22,325
Cost:
$2,300
$22,325 374,522 - - - - $22,325
374,522
kWh
-
-
$
-
-
$
03: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$15,302
Cost:
$270
$15,302 167,340 - - - - $15,302
167,340
kWh
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,010
Cost:
$590
$7,090 134,771 $(-2,080) - - - $7,090
134,771
kWh
$(-2,080)
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$25,036
Cost:
$50
$25,036 475,894 - - - - $25,036
475,894
kWh
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,772
Cost:
$25,286
$8,772 166,726 - - - - $8,772
166,726
kWh
-
-
$
-
-
$
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,783
Cost:
$4,328
$1,783 33,896 - - - - $1,783
33,896
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,324
Cost:
$33,424
$80,308 1,353,149 $(-2,080) - $13,096 - $80,308
1,353,149
kWh
$(-2,080)
-
$
$13,096
-
$
TOTAL IMPLEMENTED Savings:
$61,143
Cost:
$28,226
$63,223 1,151,913 $(-2,080) - - - $63,223
1,151,913
kWh
$(-2,080)
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $